Petition No. 201/2016: 1. Petition for seeking relief from the restriction on grid penetration upto 30% of the Distribution Transformer Capacity (DTC) for the projects commissioned before the Solar Power-Grid Connected Ground Mounted and Solar Rooftop and Metering Regulations, 2015 came to the existence and also to allow the grid penetration up to at least 50% of DTC for future projects. 2. To allow the net metering of the Solar Power plants without converting its output on to 11 KV side for the projects already commissioned before the Solar Power-Grid Connected Ground Mounted and Solar Rooftop and Metering Regulations, 2015 came to the existence and in cases where the captive consumption is more than the 3-4 times of the solar power generation then in such cases connection of solar power plant on 11 KV side may be dispensed with. And Electricity Department Chandigarh