JERC


Sr.No. Title Petitions No Petitioner In Matter Of Date Of Hearing Record of Proceeding Download
1 14/2023: PPCL- MYT Petition for PPCL Gas Power Station (32.5 MW) for the control period 2024-25 along with Annual Performance Review for the FY 2023-24, Revision of Tariff for the period 01.04.2021 to 31.03.2022 after the Provisional truing up exercise and Revision of Tariff for the period 01.04.2022 to 31.03.2023 after the Provisional truing up exercise- Reg. Petition No:114/2023 Puducherry Power Corporation Limited (PPCL) MYT Petition for determination and approval of tariff of PPCL Gas Power Station (32.5 l W) for the control period 2024-25 along with Annual Performance Review for the FY 2023-24, Revision of Tariff for the period 01.04.2021 to 31.O3.2O22 after the Provisional truing up exercise and Revision of Tariff for the period 01 .04. 2022 to 3 1 .03 .2023 after the Provisional truing up exercise 11/20/2023