1 |
Petition No. 137/2025: MYT Petition for PPCL Gas Power Station (32.5MW) for the Control Period 2025-26 to 2029-30 along with Annual Performance Review for the FY 2024-25, Revision of Tariff for the period 01.4.2022 to 31.03.2023 after the Provisional truing up exercise and Revision of Tariff for the Period 01.04.2023 to 31.03.2024 after the Provisional truing up exercise- Reg |
Petition No. 137/2025 |
PPCL |
MYT Petition for PPCL Gas Power Station (32.5MW) for the Control Period 2025-26 to 2029-30 along with Annual Performance Review for the FY 2024-25, Revision of Tariff for the period 01.4.2022 to 31.03.2023 after the Provisional truing up exercise and Revision of Tariff for the Period 01.04.2023 to 31.03.2024 after the Provisional truing up exercise- Reg |
04/25/2025 |
|
|