1 |
Order Petition No. 110/2023: Petition under Section 27 of the Energy Conservation Act, 2001 for adjudication of the penalty under Section 26 of the Energy Conservation Act, 2001 by the Adjudicating Officer and for directions to Electricity Department, UT of Andaman & Nicobar Islands to make payment of penalty as adjudicated by the Adjudicating Officer. |
Petition No. 110/2023 |
20-09-2024 |
|
2 |
Petition Under Section 142 And 146 of The Electricity Act, 2003, for Taking Action Against The Respondent And Issuance of Appropriate Direction in Terms There for Deliberate Contravention of The Directions Passed by This Hon'ble Commission on 02.12.2020 Passed in Review Petition No. 30 Of 2020, On 02.12.2020 Passed in Review Petition No. 31 Of 2020, On 31.05.2021 Passed in The Tariff Petition For FY 2021-22 And On 23.08.2021 Passed in Review Petition No. 50/2021 |
Petition No. 103/2023 |
06-05-2024 |
|
3 |
Status of Consumer Metering and billing as per Regulation 8 of the Joint Electricity Regulatory Commission (for the State of Goa & Union Territories) (Electricity Supply Code) Regulation, 2018 and as amended from time to time |
Petition No. 77/2012 |
10-11-2023 |
|
4 |
Interim Order Petitin No. 103/2023: Petition under Sections 142 and 146 of the Electricity Act, 2003, for taking action against the Respondent and issuance of appropriate directions in terms thereof, for deliberate contravention of the directions passed by this Hon’ble Commission on 02.12.2020 passed in Review Petition No. 30 of 2020, on 02.12.2020 passed in Review Petition No. 31 of 2020, on 31.05.2021 passed in the Tariff Petition for FY 2021-22 and on 23.08.2021 passed in Review Petition No. 50/2021, along with supporting Affidavit. |
Petition No. 103/2023 |
08-06-2023 |
|
5 |
Petition No. 84/2022-Petition for approval of Tariff and procurement of Power from 4MWp Floating Solar Power Plant with 2MW/1MWHr BESS. |
Petition No. 84/2022 |
24-05-2023 |
|
6 |
INTERIM ORDER Petition No. 84/2022: Petition under Section 86 (1) (b) and (e ) of the Electricity Act, 2003 and Regulation 60 of the JERC (Conduct of Business) Regulations, 2009 and other applicable provisions of the regulations notified by the Hon'ble JERC |
Petition No. 84/2022 |
18-10-2022 |
|
7 |
GENERAL ORDER |
Petition No. GENERAL ORDER |
01-08-2022 |
|
8 |
Petition No. 54/2021-Petition under Section 86(1)(b) and 86(1)(e) of the Electricity Act, 2003 for redetermination/ revision of tariff of Grid connected Roof-top Solar PV Projects in Andaman and Nicobar Islands consequent to the revision of the Central Financial Assistance from Ministry of New and Renewable Energy, Government of India. |
Petition No. 54/2021 |
09-09-2021 |
|
9 |
Order Petition No. 30/2020:Petition under Regulation 74 of the JERC (Conduct of Business) Regulations, 2009 read with Section 94(1)(f), Electricity Act, 2003 seeking Review of Tariff Order dated 20.05.2019 passed by this Hon’ble Commission in the Petition No. 274/2019 for approval of True up of FY 2015-16 & ARR for 2 nd MYT Control Period (FY 2019-20 to FY 2021-22) & determination of Retail supply Tariff for the FY 2019-20. Sea Shell Hotels & Resorts adn TSG Hotel and Resorts V/S. SE, Andaman & Nicobar Islands |
Petition No. 30/2020 |
02-12-2020 |
|
10 |
Order review Petition no. 31/2020:Petition under Regulation 74 of the JERC (Conduct of Business) Regulations, 2009 read with Section 94(1)(f), Electricity Act, 2003 seeking Review of Tariff Order dated 18.05.2020 passed by this Hon’ble Commission in the Petition No. 23 of 2019 for approval of True – up of FY 2016-17 & ARR and determination of Retail Supply Tariff for the FY 2020-21 |
Petition No. 31/2020 |
02-12-2020 |
|
11 |
Petition No. 253/2018: Petition under Section 83 read with Section 63 and other applicable provisions of the Electricity Act, 2003 for directions. |
Petition No. 253/2018 |
05-07-2018 |
|
12 |
Petition for approval of Agreement for Procurement of Power by hiring DG Set to deliver 10 MW power continuously to 33 KV grid to the ED, Andaman & Nicobar Administration at Port Blair between the ED, Andaman & Nicobar Administration and |
Petition No. 244/2017 |
19-01-2018 |
|
13 |
Petition No. 243/2017: Petition for approval of Agreement for Procurement of Power by hiring a DG Power Plant to deliver 5 MW power continuously to 33 Grid of the ED, Andaman & Nicobar Administration at Port Blair between the Electricity Department, Andaman & Nicobar Administration and M/s New Bharat Engineering Works, Navi Mumbai |
Petition No. 243/2017 |
19-01-2018 |
|
14 |
Petiton No. 242/2017: Petition for approval of agreement for "hiring of 1 x 750 KVA DG Set as Standby Power House at the Secretariat Complex" between Electricity Department, Andaman & Nicobar Administration and M/s Mona Generator Services (P) Ltd. |
Petition No. 242/2017 |
10-10-2017 |
|
15 |
Petition No. 174 /2015 : Complaint under Section 142 of the Electricity Act, 2003 read with Regulation 70 of the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Conduct of business) Regulations, 2009 |
Petition No. 174/2015 |
11-08-2017 |
|
16 |
Petition No. 236/2017 : The Review Petition filed under Section 94 of the Electricity Act, 2003 read with Regulation 74 of the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Conduct of Business) Regulation, 2009 |
Petition No. 236/2017 |
10-07-2017 |
|
17 |
Petition No. 212/ 2016 :Petition under section 61 (h) , 62, 64 read with section 86 (1) (a) , 86 (1) (b) and 86 (1) (e) of the Electricity Act, 2003 for determination of project Specific tariff for sale of power to ED of A&N in 1.125MW Renewable wave Energy project. |
Petition No. 212/2016 |
22-11-2016 |
|
18 |
Petition No. 213, 214, 215 /2016 : Determination of tariff for Procurement of Power by Distribution Company/Licensees from Biomass based Power Generating Company in the UT of A&N Islands using the Gasification route (Otto Cycle). 1.Mithakhari Industrial Area, Port Blair, Sourth Andaman District. |
Petition No. 213/2016 |
16-09-2016 |
|
19 |
Petition No. 208/2016 Petition for approval of tariff of 1MW Grid connected Roof-top Solar PV project in Andaman & Nicobar Islands under Section 62 and 83(4) of the EA, 2003 and under regulation 21,57,58,59 and 60 of the JERC (Solar Power Grid Connected Ground Mounted and Solar Rooftop and Metering) Regulations, 2015. |
Petition No. 208/2016 |
26-08-2016 |
|
20 |
Petition No. 207/2016, Petition under Section 61 and 62 of the Electricity Act, 2003 for approval of Implementation of DSM based Efficient Lighting Programme (DELP) in the Circle of operation of Electricity Department, Andaman & Nicobar under Demand Side Management Programme |
Petition No. 207/2016 |
14-07-2016 |
|
21 |
Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 |
Petition No. 89/2015 |
16-03-2015 |
|
22 |
Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 |
Petition No. 89/2012 |
15-01-2015 |
|
23 |
Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 |
Petition No. 89/2012 |
12-01-2015 |
|
24 |
Petition No. 61/2012 : Compliance of Joint Electricity Regulatory Commission for the State of Goa and UTs (Procurement of Renewable Energy) Regulation 2010 regarding Renewable Purchase Obligation (RPO). |
Petition No. 61/2012 |
12-11-2014 |
|
25 |
Petition No. 76/2012 : Loss Reduction Programme as per Regulation 15 of JERC for the State of Goa and UTs (terms and Conditions for determination of tariff Regulations, 2009 |
Petition No. 76/2012 |
05-05-2014 |
|
26 |
Petition No. 76/2012 : Loss Reduction Programme as per Regulation 15 of JERC for the State of Goa and UTs (terms and Conditions for determination of tariff Regulations, 2009 |
Petition No. 76/2012 |
06-01-2014 |
|
27 |
Petition No. 112/2013 : Petition for approval of agreement between Electricity Department, Andaman & Nicobar Administration and M/s Tractor India Pvt. Ltd., Kolkata for procurement of power by hiring of 1 MW Capacity DG, under section 86 (1) of Electricity Act, 2003. |
Petition No. 112/2013 |
20-11-2013 |
|
28 |
Petition No. 111/2013 : Petition for approval of agreement between Electricity Department, Andaman & Nicobar Administration and M/s Mona Generator Service Pvt. Ltd., New Delhi for procurement of power by hiring of 40-65 KW Capacity DG under section 86 (1) of Electricity Act, 2003. |
Petition No. 111/2013 |
20-11-2013 |
|
29 |
Petition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. |
Petition No. 117/2013 |
13-11-2013 |
|
30 |
Petition No. 118/2013 : Petition for approval of agreement for hiring of 5 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s New Bharat Engineering, Navi Mumbai under section 86 (1) (b) of Electricity Act, 2003. |
Petition No. 118/2013 |
13-11-2013 |
|
31 |
Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 |
Petition No. 89/2012 |
30-10-2013 |
|
32 |
Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. |
Petition No. 11/2011 |
29-10-2013 |
|
33 |
Petition No. 76/2012 : Loss reduction programme |
Petition No. 76/2012 |
25-10-2013 |
|
34 |
Petition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. |
Petition No. Date of Order :07/10/2013 |
07-10-2013 |
|
35 |
Petition for approval of agreement for hiring of 5 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s New Bharat Engineering, Navi Mumbai under section 86 (1) (b) of Electricity Act, 2003. |
Petition No. order 07/10/2013 |
07-10-2013 |
|
36 |
Petition No. 109/2013 : Review Petition under Section 94 of the Electricity Act, 2003 of Order dated 3.07.2013 passed by this Commission in petition no. 89/2013 for fixation of completed / actual capital cost and Tariff of the project of the petitioner - Power Generating Company |
Petition No. 109/2013 |
19-09-2013 |
|
37 |
Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 |
Petition No. 89/2012 |
19-09-2013 |
|
38 |
Petition No. 108/2013 : Review petition under Regulation 74 read with Regulation 12 of JERC ( Conduct of Business) Regulations, 2009 of order dated 3.07.2013 passed by this Commission in petition no. 89/2013 for fixation of completed / actual capital cost bof project and Tariff of the project of the petitioner -a Power Generating Company. |
Petition No. 108/2013 |
19-09-2013 |
|
39 |
Petition for approval of agreement for hiring of 5 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s New Bharat Engineering, Navi Mumbai under section 86 (1) (b) of Electricity Act, 2003. |
Petition No. 77/2012 |
22-08-2013 |
|
40 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. |
Petition No. 68/2012 |
05-08-2013 |
|
41 |
Petition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. |
Petition No. Order |
22-07-2013 |
|
42 |
Petition for approval of agreement for hiring of 5 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s New Bharat Engineering, Navi Mumbai under section 86 (1) (b) of Electricity Act, 2003 |
Petition No. Order |
22-07-2013 |
|
43 |
Petition No. 76/2012 : Loss reduction programme. |
Petition No. 76/2012 |
10-07-2013 |
|
44 |
Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations. |
Petition No. 78/2012 |
08-07-2013 |
|
45 |
Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 |
Petition No. 89/2012 |
14-06-2013 |
|
46 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. |
Petition No. 68/2012 |
14-06-2013 |
|
47 |
Petition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. |
Petition No. Order section 83 |
14-06-2013 |
|
48 |
Petition for approval of agreement for hiring of 5 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s New Bharat Engineering, Navi Mumbai under section 86 (1) (b) of Electricity Act, 2003. |
Petition No. Order |
14-06-2013 |
|
49 |
Petition No. 77/2012 : Consumer metering, reading and billing category wise |
Petition No. 77/2012 |
27-05-2013 |
|
50 |
Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations |
Petition No. 78/2012 |
30-04-2013 |
|
51 |
Petition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. |
Petition No. Order |
30-04-2013 |
|
52 |
Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 |
Petition No. 89/2012 |
17-04-2013 |
|
53 |
Petition No. 94/2013 : Petition for approval of Power Purchase Agreement (PPA) between Electricity Department, Andaman & M/s Suryachakra Green Fuel Pvt. Ltd. under section 86(1) (b) of Electricity Act, 2003. |
Petition No. 94/2013 |
17-04-2013 |
|
54 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections |
Petition No. 68/2012 |
17-04-2013 |
|
55 |
Petition No. 93/2013 : Petition for approval of Power Purchase Agreement (PPA) between Electricity Department, Andaman & Nicobar Administration, and NTPC Ltd |
Petition No. 93/2013 |
17-04-2013 |
|
56 |
petition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. |
Petition No. 104/2013 |
22-03-2013 |
|
57 |
Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 |
Petition No. 89/2012 |
12-03-2013 |
|
58 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections |
Petition No. 68/2012 |
27-02-2013 |
|
59 |
Petition No. 94/2013 : Petition for approval of Power Purchase Agreement (PPA) between Electricity Department, Andaman & M/s Suryachakra Green Fuel Pvt. Ltd. under section 86(1) (b) of Electricity Act, 2003. |
Petition No. 94/2013 |
26-02-2013 |
|
60 |
Petition No. 93/2013 : Petition for approval of Power Purchase Agreement (PPA) between Electricity Department, Andaman & Nicobar Administration, and NTPC Ltd. |
Petition No. 93/2013 |
26-02-2013 |
|
61 |
Petition No. 97/2013 : Petition for adjudication of disputes between M/s Suryachkra Power Crporation- a power generating company Limited and Electricity Department Andaman & Nicobar Islands -a Distribution Licensee under Regulation 65 of JERC ( Conduct of Business) Regulations,2009 and Section 86 (1) (f) of the Electricity Ac |
Petition No. 97/2013 |
26-02-2013 |
|
62 |
Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations |
Petition No. 78/2012 |
19-02-2013 |
|
63 |
Petition No. 93/2013 : Petition for approval of Power Purchase Agreement (PPA) between Electricity Department, Andaman & Nicobar Administration, and NTPC Ltd. |
Petition No. 93/2013 |
05-02-2013 |
|
64 |
Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 |
Petition No. 89/2012 |
31-01-2013 |
|
65 |
Petition No. 75/2012 : Standard of Performance (SOP) Non-submission of monthly / quarterly and annual report. |
Petition No. 75/2012 |
30-01-2013 |
|
66 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. |
Petition No. 68/2012 |
26-11-2012 |
|
67 |
Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. |
Petition No. 11/2011 |
26-06-2012 |
|
68 |
Petition No. 76/2012 : Loss reduction Programme |
Petition No. 76/2012 |
22-06-2012 |
|
69 |
Petition No. 78/2012 : Operationalization of Open Access |
Petition No. 78/2012 |
22-06-2012 |
|
70 |
Petition No. 77/2012 : Status of Consumer metering, Reading and Billing category wise. |
Petition No. 77/2012 |
21-06-2012 |
|
71 |
Petition No. 75/2012 : Standard of Performance (SOP) Non-submission of monthly /quarterly and annual report |
Petition No. 75/2012 |
21-06-2012 |
|
72 |
Petition No. 11/2011: Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity |
Petition No. 11/2011 |
18-10-2011 |
|
73 |
Petition No. 11/2010:Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon’ble Appellate Tribunal for Electricity. |
Petition No. 11/2010 |
23-08-2011 |
|
74 |
Petition No. 11/2010 : Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity. |
Petition No. 11/2010 |
08-07-2011 |
|
75 |
Petition No. 23/2011:Designation of agency as State Agency for accreditation and recommending the renewable energy projects for registration. Compliance of regulation 3.1 of the JERC (Procurement of Renewable Energy) Regulations, 2010. |
Petition No. 23/2011 |
15-04-2011 |
|
76 |
Filing of the Tariff Petition for the FY 2011 - 12 Compliance of JERC for the State of Goa and UTs (Terms and Conditions for Determination of Tariff) Regulations, 2009. |
Petition No. 22/2010 |
09-02-2011 |
|
77 |
Petition for approval for purchase ofpower from proposed solar PV based power plants of NTPC LTD. in Andaman & Nicobar Islands. |
Petition No. 24/2011 |
09-02-2011 |
|
78 |
Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments |
Petition No. 7/2009 |
12-07-2010 |
|
79 |
Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments |
Petition No. 07/2010 |
14-06-2010 |
|
80 |
Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments |
Petition No. 07 /2009 |
23-03-2010 |
|
81 |
Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payment |
Petition No. 7/2009-Misc |
23-02-2010 |
|
82 |
Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments |
Petition No. 07/2009 |
28-01-2010 |
|
83 |
Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments |
Petition No. 7/2009-Misc |
09-12-2009 |
|
84 |
Settlement of long pending issues/payments with Electricity Department Andaman & Nicobar Administration |
Petition No. 2 of 2009 |
03-09-2009 |
|