1 |
Status of Consumer Metering and billing as per Regulation 8 of the Joint Electricity Regulatory Commission (for the State of Goa & Union Territories) (Electricity Supply Code) Regulation, 2018 and as amended from time to time |
Petition No. 77/2012 |
10-11-2023 |
|
2 |
Petition No. 59/2021:Seeking the approval of the Commission for purchase of 100 MW Solar Power from ISTS Connected Power Projects through M/s NTPC Ltd. and to adopt the tariff as determined through competitive bidding process. |
Petition No. 59/2021 |
24-02-2023 |
|
3 |
Relaxation of the Provision 4.4 of the JERC for the State of Goa and Union Territories (Solar PV Grid Interactive System based on Net-Metering) Regulations, 2019, imposing cap on maximum Solar Power Generation Capacity to be installed at Consumer premises. |
Petition No. 83/2022 |
15-12-2022 |
|
4 |
Petition No. 83/2022: Relaxation of the Provision 4.4 of the JERC for the State of Goa and Union Territories (Solar PV Grid Interactive System based on Net-Metering) Regulations, 2019, imposing cap on maximum Solar Power Generation Capacity to be installed at Consumer premises. |
Petition No. 83/2022 |
27-09-2022 |
|
5 |
GENERAL ORDER |
Petition No. GENERAL ORDER |
01-08-2022 |
|
6 |
Order Review Petition No. 82/2022: Review of Tarif Order dated 31.03.2022 issued by the Hon’ble Commission on True-up for FY 2020-21, Annual Performance Review for FY 2021-22 and Aggregate Revenue Requirement (ARR) 3rd Control Period and determination of Retail Tariff for the FY 2022-23 in Petition No. 70/2021 for the Electricity Department, Government of Puducherry |
Petition No. 82/2022 |
28-07-2022 |
|
7 |
Petition on behalf of the Petitioner under Section 86(1)(f) read with Sections 142 and 146 of the Electricity Act, 2003, for issuance of appropriate directions in terms thereof, against, the Puducherry Electricity Department (“PED”) for deliberate contravention of the directions passed by this Hon’ble Commission vide its Order dated 21.09.2020 in Case No. 26 of 2019. |
Petition No. 73/2021 |
04-02-2022 |
|
8 |
Petition No. 46 of 2021 -Relaxation of the Provision 4.4 of the JERC for the State of Goa and Union Territories (Solar PV Grid Interactive System based on Net-Metering) Regulations, 2019, imposing cap on maximum Solar Power Generation Capacity to be installed at Consumer premises. |
Petition No. 46/2021 |
22-06-2021 |
|
9 |
Order Petition No. 26/2019: Petition under section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 5(ii) and Regulation 17 of JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019 imploring this Hon’ble Commission to grant approval for signing the open access agreement and to direct the Respondent to exempt the Petitioner from Open Access Restrictions and associated charges including losses, by exercising its power to relax envisaged under the above Regulations. |
Petition No. 26/2019 |
16-06-2020 |
|
10 |
Petition No. 241/2017: Review Petition under Section 94 (1) (f) of the Electricity Act, 2003 read with Section 74 of the JERC (Conduct of Business) Regulations, 2009 seeking review of the Order dated 16.05.2017 in Petition No. 224/2017 and for re-determination of Cross subsidy surcharge as well as the voltage wise wheeling charges levied on Open Access consumers |
Petition No. 241/2017 |
10-10-2017 |
|
11 |
Petition No. 199/2016 : Seeking approval of Hon'ble Commission for the Implementation of Smart Grid Pilot Project in Puducherry |
Petition No. 199/2016 |
25-04-2016 |
|
12 |
Petition No. 187/ 2015 : Seeking approval / concurrence under Regulation 60 (C) of Joint Electricity Regulatory Commission for the State of Goa & UTs (Conduct of Business) Regulations, 2009 for the Power Purchase Agreement to be entered into by the Electricity Department, Government of Puducherry (EDP) with NLC Thermal Power Station -II (2nd Expansion) (2X500) MW. |
Petition No. 187/2015 |
27-11-2015 |
|
13 |
Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 |
Petition No. 89/2015 |
16-03-2015 |
|
14 |
Petition No. 156/ 2014 :Petition under Regulation 60 (c) of JERC (Conduct of Business) Regulations, 2009 for approval of Power Purchase Agreement to be entered into by Electricity Department, Govt of Puducherry with M/s Kudankulam Nuclear Power Project, (KKNPP) NPCIL |
Petition No. 156/2014 |
05-01-2015 |
|
15 |
Petition No. 61/2012 : Compliance of Joint Electricity Regulatory Commission for the State of Goa and UTs (Procurement of Renewable Energy) Regulation 2010 regarding Renewable Purchase Obligation (RPO). |
Petition No. 61/2012 |
12-11-2014 |
|
16 |
Petition No. 145/ 2014 :Petition under Section 62 and 83 (4) of the Electricity Act, 2003 read with chapter-II of the Joint Electricity Regulatory Commission for the State Goa and UTs (Terms and Conditions for determination of Tariff) Regulations, 2009 for approval of Tariff Puducherry Power Corporation Ltd. Gas Power Station (32.5 MW) at Karaikal for the period 2014-15 |
Petition No. 145/2014 |
11-11-2014 |
|
17 |
Petition No. 96/2013: ARR and Tariff Determination for FY 2013-14 and True-up for FY 2009-10 & FY 2010-11, Provisional True-up for FY 2011-12 and Review for FY 2012-13. Petition No. 96/2013 for Govt. of Puducherry, Electricity Department, Puducherry |
Petition No. 96/2013 |
28-10-2014 |
|
18 |
Petition No. 96/2013: ARR and Tariff Determination for FY 2013-14 and True-up for FY 2009-10 & FY 2010-11, Provisional True-up for FY 2011-12 and Review for FY 2012-13. Petition No. 96/2013 for Govt. of Puducherry, Electricity Department, Puducherry |
Petition No. 96/2013 |
26-08-2014 |
|
19 |
Petition No. 137/2014 : Petition for review of Tariff Order dated 25.04.2014 passed by the Joint Electricity Regulatory Commission for Goa and UTs for ED- Puducherry in petition no. 125/2014 |
Petition No. 137/2014 |
21-08-2014 |
|
20 |
Petition No. 140/2014 : Petition for seeking clarification in certain provisions of Joint Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2010 and the Joint Electricity Regulatory Commission (Electricity Supply Code ) first Amendment Regulation, 2013 |
Petition No. 140/2014 |
08-08-2014 |
|
21 |
Petition No. 139/2014 : Petition for seeking approval of Joint Electricity Regulatory Commission for State of Goa and UTs for exemption from claiming of FPPCA from Domestic Consumers category for Quaters I and II of the Financial Year 2013-14 by providing subsidy by the Government of Puducherry. |
Petition No. 139/2014 |
08-08-2014 |
|
22 |
Petition No. 137/2014 : Petition for review of Tariff Order dated 25.04.2014 passed by the Joint Electricity Regulatory Commission for Goa and UTs for ED- Puducherry in petition no. 125/2014 |
Petition No. 137/2014 |
15-07-2014 |
|
23 |
Petition No. 76/2012 : Loss Reduction Programme as per Regulation 15 of JERC for the State of Goa and UTs (terms and Conditions for determination of tariff Regulations, 2009 |
Petition No. 76/2012 |
05-05-2014 |
|
24 |
Petition No. 128/2014 : Petition for seeking approval for implementation of DSM based Efficient Lightning Program (DELP) in UT of Puducherry under Demand Side Management programme. |
Petition No. 128/2014 |
25-04-2014 |
|
25 |
Petition No. 39/2011 : Petition for determination of tariff for 1.0 MW Power from Roof top PV & Small Solar Power Generation Programme (RPSSGP) for supply to ED- UT Puducherry. |
Petition No. 39/2011 |
21-04-2014 |
|
26 |
Petition No. 76/2012 : Loss Reduction Programme as per Regulation 15 of JERC for the State of Goa and UTs (terms and Conditions for determination of tariff Regulations, 2009 |
Petition No. 76/2012 |
06-01-2014 |
|
27 |
Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003. |
Petition No. 102/2013 |
28-11-2013 |
|
28 |
Petition No. 113/2013 : Deferment of claim of Fuel and Power Purchase Cost Adjustment for the first quarter of the year 2013-14 |
Petition No. 113/2013 |
29-10-2013 |
|
29 |
Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. |
Petition No. 11/2011 |
29-10-2013 |
|
30 |
Petition No. 76/2012 : Loss reduction programme |
Petition No. 76/2012 |
25-10-2013 |
|
31 |
Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003. |
Petition No. 102/2013 |
29-09-2013 |
|
32 |
Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003. |
Petition No. 102/2013 |
19-09-2013 |
|
33 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. |
Petition No. 68/2012 |
05-08-2013 |
|
34 |
Petition No. 107/2013 : Petition for approval for Commission for executing SCADA/ DMS and Distribution improvement works for Puducherry Town under Part-A and Part- B works of R-APDRP Scheme and exucuting various Transmission system Strengthening works.. |
Petition No. 107/2013 |
22-07-2013 |
|
35 |
Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003. |
Petition No. 102/2013 |
18-07-2013 |
|
36 |
Petition No. 76/2012 : Loss reduction programme. |
Petition No. 76/2012 |
10-07-2013 |
|
37 |
Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations. |
Petition No. 78/2012 |
08-07-2013 |
|
38 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. |
Petition No. 68/2012 |
14-06-2013 |
|
39 |
Petition No. 77/2012 : Consumer metering, reading and billing category wise |
Petition No. 77/2012 |
27-05-2013 |
|
40 |
Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations |
Petition No. 78/2012 |
30-04-2013 |
|
41 |
Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003. |
Petition No. 102/2013 |
30-04-2013 |
|
42 |
Petition No. 18/2010 & 45/2011: Petition for review of order dated 06.08.2011 passed by the Hon'ble Commission in the matter of determination of tariff for Puducherry Power Corporation Limited (PPCL) Gas Power Station (32.5 MW) for the year FY 2011-12. |
Petition No. 18/2010 & 45/2011 |
17-04-2013 |
|
43 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections |
Petition No. 68/2012 |
17-04-2013 |
|
44 |
Petition No. 39/2011 : Petition for determination of tariff for 1.0 MW Power from Roof top PV & Small Solar Power Generation Programme (RPSSGP) for supply to ED- UT Puducherry. |
Petition No. 39/2011 |
27-02-2013 |
|
45 |
Petition No. 18/2010 & 45/2011: Petition for review of order dated 06.08.2011 passed by the Hon'ble Commission in the matter of determination of tariff for Puducherry Power Corporation Limited (PPCL) Gas Power Station (32.5 MW) for the year FY 2011-12. |
Petition No. 18/2010 & 45/2011 |
27-02-2013 |
|
46 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections |
Petition No. 68/2012 |
27-02-2013 |
|
47 |
Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations |
Petition No. 78/2012 |
19-02-2013 |
|
48 |
Petition No. 39/2011 : Petition for determination of tariff for 1.0 MW Power from Roof top PV & Small Solar Power Generation Programme (RPSSGP) for supply to ED- UT Puducherry. |
Petition No. 39/2011 |
30-01-2013 |
|
49 |
Petition No. 75/2012 : Standard of Performance (SOP) Non-submission of monthly / quarterly and annual report. |
Petition No. 75/2012 |
30-01-2013 |
|
50 |
Petition No. 18/2010 & 45/2011: Petition for review of order dated 06.08.2011 passed by the Hon'ble Commission in the matter of determination of tariff for Puducherry Power Corporation Limited (PPCL) Gas Power Station (32.5 MW) for the year FY 2011-12. |
Petition No. 18/2010 & 45/2011 |
23-01-2013 |
|
51 |
Petition No. 83/2011 : Discrepancy in the information submitted to the Commission & Bureau of Energy Efficiency regarding heat rate |
Petition No. 83/2011 |
19-12-2012 |
|
52 |
Petition No. 18/2010 & 45/2011: Petition for review of order dated 06.08.2011 passed by the Hon'ble Commission in the matter of determination of tariff for Puducherry Power Corporation Limited (PPCL) Gas Power Station (32.5 MW) for the year FY 2011-12. |
Petition No. 18/2010 & 45/2011 |
19-12-2012 |
|
53 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. |
Petition No. 68/2012 |
26-11-2012 |
|
54 |
Petition No. 73/2012 : Seeking advice of the JERC for State of Goa & Union Trritories Commission in the matter relating Corporatization / Restructuring of the Electricity Department, Puducherry |
Petition No. 73/2012 |
07-09-2012 |
|
55 |
Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. |
Petition No. 11/2011 |
26-06-2012 |
|
56 |
Petition No. 76/2012 : Loss reduction Programme |
Petition No. 76/2012 |
22-06-2012 |
|
57 |
Petition No. 78/2012 : Operationalization of Open Access |
Petition No. 78/2012 |
22-06-2012 |
|
58 |
Petition No. 77/2012 : Status of Consumer metering, Reading and Billing category wise. |
Petition No. 77/2012 |
21-06-2012 |
|
59 |
Petition No. 75/2012 : Standard of Performance (SOP) Non-submission of monthly /quarterly and annual report |
Petition No. 75/2012 |
21-06-2012 |
|
60 |
Petition No. 19/2010 : Incremental Fuel Surcharge for the period from April, 2010 to October, 2010 for the Electricity Department Puducherry. |
Petition No. 19/2010 |
11-06-2012 |
|
61 |
Petition No. 39/2011 : Petition for determination of tariff for 1.0 MW Power from Roo top PV & Small Solar Power Generation Programme (RPSSGP) for supply to the Puducherry Utility. |
Petition No. 39/2011 |
07-06-2012 |
|
62 |
Petition No. 19/2010 : Incremental Fuel Surcharge for the period from April, 2010 to October, 2010 for the Electricity Department Puducherry |
Petition No. 19/2010 |
29-05-2012 |
|
63 |
Seeking advice of the JERC for State of Goa & Union Trritories Commission in the matter relating Corporatization / restruscturing of the Electricity Department, Puducherry |
Petition No. 73/2012 |
29-05-2012 |
|
64 |
Petition No. 60/2011: Approval of Aggregate Revenue Requirement for Tariff Proposal for the FY 2012-13. |
Petition No. 60/2011 |
18-01-2012 |
|
65 |
Petition No. 58/2011: Approval of Aggregate Revenue Requirement for Tariff Proposal for the FY 2011-12. |
Petition No. 58/2011 |
18-01-2012 |
|
66 |
Petition seeking the approval for Power Purchase Aggrement proposed to be entered into with Project proponents qualifying under JNNSM scheme |
Petition No. 17/ 2010 |
19-10-2011 |
|
67 |
Petition No. 11/2011: Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity |
Petition No. 11/2011 |
18-10-2011 |
|
68 |
Petition No. 11/2010:Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon’ble Appellate Tribunal for Electricity. |
Petition No. 11/2010 |
23-08-2011 |
|
69 |
Petition No. 19/2011: Incremental Fuel Surcharge for the period from April,2011 to October,2010 for the Electricity Department Puducherry |
Petition No. 19/2011 |
12-08-2011 |
|
70 |
Petition No. 34/2011: Petition for approval to carry forward of renewable purchase obligation (RPO) compliance requirement for the year 2010-11 to the next financial yea |
Petition No. 34/2011 |
15-07-2011 |
|
71 |
Petition No. 35/2011: Seeking approval under Regulation 62 of JERC(conduct of Business) Regulations,2009, for making investment decision under R-APDRP scheme Part-A |
Petition No. 35/2011 |
14-07-2011 |
|
72 |
Petition No. 19/2010:Petition for seeking approval of the Commission for passing on the incremental power purchase |
Petition No. 19/2010 |
08-07-2011 |
|
73 |
Petition No. 11/2010 : Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity. |
Petition No. 11/2010 |
08-07-2011 |
|
74 |
Petition No. 23/2011:Designation of agency as State Agency for accreditation and recommending the renewable energy projects for registration. Compliance of regulation 3.1 of the JERC (Procurement of Renewable Energy) Regulations, 2010. |
Petition No. 23/2011 |
15-04-2011 |
|
75 |
Petition No. 25/2011: ARR & Tariff Petition of EDP for the year 2009-10 regarding filing of Action Taken Report by June, 2010. |
Petition No. 25/2011 |
10-03-2011 |
|
76 |
Filing of the Tariff Petition for the FY 2011 - 12 Compliance of JERC for the State of Goa and UTs (Terms and Conditions for Determination of Tariff) Regulations, 2009. |
Petition No. 22/2010 |
09-02-2011 |
|
77 |
Petition for seeking approval of the Commission for passing on the incremental power purchase cost to the approved class of Consumers of Electricity Department, Puducherry. |
Petition No. 19/ 2010 |
24-01-2011 |
|
78 |
Seeking the approval of the Hon'ble Commission under regulation 60 (c) of the JERC (Conduct of Business) Regulation 2009, for the Draft Power Purchase Agreement proposed to be entered by the Electricity Department, Government of Puducherry with M/s Neyveli Lignite Corporation Ltd., Neyveli, Tamil Nadu. |
Petition No. 15/ 2010 |
19-10-2010 |
|
79 |
Seeking the approval of the Hon'ble Commission under regulation 60 (c) of the JERC (Conduct of Business) Regulation 2009, for the Draft Power Purchase Agreement proposed to be entered by the Electricity Department, Government of Puducherry with M/s Neyveli Lignite Corporation Ltd., Neyveli, Tamil Nadu |
Petition No. 15/2010 |
04-10-2010 |
|
80 |
Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments |
Petition No. petition no.19. 01. 10 |
06-01-2010 |
|