Saturday, June 24, 2017

Petitions Archives Print Back
Title Petitioner File Name Date of Receiving
Petition No. 201/2016: 1. Petition for seeking relief from the restriction on grid penetration upto 30% of the Distribution Transformer Capacity (DTC) for the projects commissioned before the Solar Power-Grid Connected Ground Mounted and Solar Rooftop and Metering Regulations, 2015 came to the existence and also to allow the grid penetration up to at least 50% of DTC for future projects. 2. To allow the net metering of the Solar Power plants without converting its output on to 11 KV side for the projects already commissioned before the Solar Power-Grid Connected Ground Mounted and Solar Rooftop and Metering Regulations, 2015 came to the existence and in cases where the captive consumption is more than the 3-4 times of the solar power generation then in such cases connection of solar power plant on 11 KV side may be dispensed with. And Electricity Department Chandigarh 201 Edit (Size: 0.18MB )
Friday, April 1, 2016
Petition No. 200/2016: Petition for approval of Draft Solar Net / Gross Metering power Purchase Agreement (PPA). And Electricity Department Chandigarh chd30316 Edit (Size: 1.25MB )
Tuesday, March 22, 2016
Petition No. 198/2016: PETITION FOR TRUE-UP OF FY 2013-14 & FY 2014-15, ANNUAL PERFORMANCE REVIEW OF FY 2015-16 AND AGGREGATE REVENUE REQUIREMENT (ARR) FOR MYT CONTROL PERIOD FROM FY 2016-17 TO FY 2018-19 & TARIFF PROPOSAL FOR FY 2016-17 of CHANDIGARH ELECTRICITY DEPARTMENT And Electricity Department Chandigarh MYTCHD16-17 Edit (Size: 1.20MB )
Monday, February 29, 2016
Petition No. 197/2016: ANNUAL PERFORMANCE REVIEW OF FY 2015-16 AND AGGREGATE REVENUE REQUIREMENT (ARR) WITH TARIFF PROPOSAL FOR MYT CONTROL PERIOD FROM FY 2016-17 TO FY 2018-19 OF ELECTRICITY DEPARTMENT, GOVERNMENT OF GOA And Electricity Department Goa mytgoa16-17a Edit (Size: 3.05MB )
Thursday, February 18, 2016
Petition No. 196/2016: Petition for Multi year tariff for 3 year Control period from FY 2016-17 to 2018-19 And Electricity Department Andaman & Nicobar Admn. n2016-17a_1638 Edit (Size: 3.43MB )
Tuesday, February 9, 2016
Petition No. 195/2016: Filing of Aggregate Revenue Requirement (ARR) for the FY 2016-17 for Electricity Department Transmission Division, UT of Dadra and Nagar Haveli under Section 61,62, and 64 of the Electricity Act, 2003 And Electricity Department Dadra & Nagar Haveli : Petitioner DNHTRANS16-17 Edit (Size: 0.26MB )
Monday, January 25, 2016
Petition No. 194/2016: Petition for approval of Business Plan and Multi Year Tariff Determination for the MYT Control Period FY 2016-17 to FY 2018-19. And Electricity Department Lakshadweep : Petitioner LEDMYT Edit (Size: 0.70MB )
Tuesday, January 19, 2016
Petition No. 192/2016: True up for FY 2014-15, ARR for Multi Year Tariff Determination for Control Period FY 2016-17 to FY 2018-19 and Tariff Revision Proposal for FY 2016-17. And Electricity Department Daman & Diu .. Petitioner MYTDD1617 Edit (Size: 0.69MB )
Tuesday, January 19, 2016
Petition No. 191/2016:Petition for determination and approval of tariff of PPCL Gas Power Station (32.5 MW) for the period 2016-17 And in the matter And Puducherry Power Corp. Ltd.... Petitioner ppclmyt1617a Edit (Size: 3.33MB )
Thursday, January 7, 2016
Petition No. 190 /2016: Petition for approval of True up Petition of 2013-14, provisional true up Petition of 2014-15, Annual Performance Review of 2015-16 and Aggregate Revenue Requirement (ARR) with Tariff Proposal for MYT Control period from FY 2016-17 to 2018-19 And Electricity Department, Puducherry.... Petitioner mytpudu1617 Edit (Size: 2.60MB )
Thursday, January 7, 2016
Petition No. 186 /2015: Petition for approval of Business Plan for the MYT Control Period FY 2016-17 to FY 2018-19 Ltd under the JERC( Multi Year Distribution Tariff) Regulations, 2014. And Electricity Department, Goa .... Petitioner BPGOA15a Edit (Size: 2.18MB )
Tuesday, October 6, 2015
Petition No. 185 /2015: Petition for approval of Business Plan for the MYT Control Period FY 2016-17 to FY 2018-19 Ltd under the JERC( Multi Year Distribution Tariff) Regulations, 2014. And Electricity Department, Andaman & Nicobar Admn. .... Petitioner ANBP16-17_1421 Edit (Size: 1.47MB )
Monday, September 14, 2015
Petition No. 181/2015: Petition for approval of Business Plan for the MYT Control Period FY 2016-17 to FY 2018-19 under the JERC ( Multi Year Distribution Tariff) Regulations, 2014. And Electricity Department, Puducherry .... Petitioner BPPUDU16-19 Edit (Size: 2.75MB )
Wednesday, August 5, 2015
Petition No. 164/ 2015: Petition for approval of Business Plan and Multi Year Tariff for the Control Period FY 2015-16 to FY 2017-18 of Electricity Department, Chandigarh TFCHD Edit (Size: 0.69MB )
Wednesday, March 11, 2015
Petition No. 163/ 2015: Petition for approval of Business Plan for the Control Period FY 2015-16 to FY 2017-18 of Electricity Department, Chandigarh bpchda Edit (Size: 1.32MB )
Tuesday, February 24, 2015
Petition No. 161/ 2015: Petition for approval of Multi Year Tariff for the Control Period FY 2015-16 to FY 2017-18 of Electricity Department, Govt of Goa MYTGOA Edit (Size: 3.57MB )
Tuesday, January 20, 2015
Petition No. 160/ 2015: Petition for approval of Business Plan for the Control Period FY 2015-16 to FY 2017-18 of Electricity Department, Govt of Goa BPGOA Edit (Size: 1.96MB )
Tuesday, January 20, 2015
Petition No. 159/ 2015: Petition for determination and approval of tariff of PPCL Gas Power Station (32.5 MW) for the period 2015-16 ARRPPCLword Edit (Size: 1.45MB )
Monday, January 5, 2015
Petition No. 157/ 2014: Petition for approval of Multi Year Tariff for the Control Period FY 2015-16 to FY 2017-18 of Electricity Department, Govt of Puducherry MYTEDP Edit (Size: 3.41MB )
Friday, January 2, 2015
Petition No. 155/ 2014 for approval of Multi Year Tariff and Revenue Requirement for the control period FY 2015-16 to 2017-18 under Section 61, 62 and 64 of the Electricity Act, 2003. ARRANI15-16 Edit (Size: 0.89MB )
Monday, December 15, 2014
Petition No. 153/ 2014 for Business Plan and ARR for the MYT Control Period FY 2015-16 to 2017-18 BPDDnew Edit (Size: 1.83MB )
Tuesday, December 2, 2014
Petition No. 154/ 2014 for Business Plan and ARR for the MYT Control Period FY 2015-16 to 2017-18 BPDNHPDCL Edit (Size: 2.91MB )
Tuesday, December 2, 2014
Petition No. 151/2014 : Truing up for FY 2013-14, Review of FY 2014-15, ARR for Multi Year Tariff Determination for Control Period FY 2015 -16 to FY 2017-18 And Tariff Revision Proposal for FY 2015-16. MYTDNHPDCL Edit (Size: 1.45MB )
Tuesday, December 2, 2014
Petition No. 150/2014 : Petition for approval of Annual Revenue Requirement (ARR) and Tariff Proposal for FY 2015-16 for Electricity Department, Transmission Division under Section 61,62 and 64 of Electricity Act, 2003. trans Edit (Size: 1.95MB )
Tuesday, December 2, 2014
Petition No. 148/2014 : Truing up for FY 2013-14, Review of FY 2014-15, ARR for Multi Year Tariff Determination for Control Period FY 2015 -16 to FY 2017-18 And Tariff Revision Proposal for FY 2015-16. MYTDD Edit (Size: 1.10MB )
Tuesday, December 2, 2014
Petition No. 152/ 2014 for Business Plan and ARR for the MYT Control Period FY 2015-16 to 2017-18 BPAN_1002 Edit (Size: 2.31MB )
Monday, November 17, 2014
Petition No. /2014 : APPLICATION ON BEHALF OF OBJECTOR FOR REVIEW OF ORDERS DATED 24.06.2014 PASSED BY HON’BLE JOINT ELECTRICITY REGULATORY COMMISSION. revmanpoweraug14 Edit (Size: 0.04MB )
Tuesday, August 19, 2014
Petition No. 133/2014 : REVIEW PETITION UNDER CLAUSE 74 OF THE JERC CONDUCT OF BUSINESS REGULATIONS, 2009 READ WITH SECTION 94 (f) of the ELECTRICITY ACT 2003 FOR REVIEWING THE TARIFF ORDER DATED 11-4-2014, PASSED BY THIS HON’BLE COMMISSION, IN PETITION NO 110 OF 2013, TITLED AS CHANDIGARH RENEWAL ENERGY SCIENCE & TECHNOLOGY PROMOTION SOCIETY VS. ELECTRICITY DEPARTMENT, UT, CHANDIGARH .And Chandigarh Renewal Energy Science & Technology Promotion Society, Ist Floor, Paryavaran Bhawan, Sector 19, Chandigarh ( Referred herein after as CREST in the petition) Through its Chief Executive Officer Sh. Santosh Kuma revcrest Edit (Size: 0.07MB )
Thursday, May 22, 2014
Petition No. 129/2014 : Petition in respect of detailed study on manpower requirement at Chandigarh Electricity Department manpower Edit (Size: 1.29MB )
Monday, February 17, 2014
Petition No. 128/2014 : Petition for seeking approval for implementation of DSM based Efficient Lighting Program (DELP) in UT of Puducherry under Demand Side Management Progrmame. delp2 Edit (Size: 0.37MB )
Friday, February 14, 2014
Petition No. 130/2014 : Petition for determination of tariff for supply of surplus power from co-generation power plant of Goa Sponge and Power Limited to Goa Electricity Department under Section 62 (1) (a) and 86 (1) (a) to (e) of The Electricity Act, 2003 arrGSPL Edit (Size: 0.50MB )
Tuesday, January 21, 2014
Petition No. 126/2014 : Petition for approval of the Aggregate Revenue Requirement (ARR) and Tariff Proposal for FY 2014-15 for the Electricity Department of Chandigarh under Section 45, 46, 61 62, 64 and 86 of the Electricity Act, 2003 arrchd14-15 Edit (Size: 1.34MB )
Tuesday, January 21, 2014
Petition No. 125/2014 : PETITION FOR APPROVAL OF AGGREGATE REVENUE REQUIREMENT (ARR), EXPECTED REVENUE FROM CHARGES (ERC), TARIFF PROPOSAL FOR FY 2014-15 OF ELECTRICITY DEPARTMENT, GOVERNMENT OF PUDUCHERRY arrpudu14-15 Edit (Size: 1.05MB )
Monday, January 20, 2014
Petition No. 124/2014 : Petition for approval of Annual Revenue Requirement (ARR) and Tariff proposal for FY 2014-15 for the UT of Andaman & Nicobar Islands under Section 61, 62 and 64 of the Electricity Act, 2003 arrani14-15 Edit (Size: 1.66MB )
Thursday, January 16, 2014
Petition No. 123/2014 : Petition for approval of Annual Revenue Requirement (ARR) and Tariff proposal for FY 2014-15 for the UT of Lakshadweep under Section 61, 62 and 64 of the Electricity Act, 2003v arrlkd14-15 Edit (Size: 0.94MB )
Wednesday, January 15, 2014
Petition No. 122/2014 : Petition for approval of Review for FY 2013-14 and Aggregate Revenue Requirement (ARR) for FY 2014-15 for the Electricity Department of Goa under Section 45, 46, 61 62, 64 and 86 of the Electricity Act, 2003 arrgoajan Edit (Size: 0.93MB )
Monday, January 13, 2014
Petition No. 121/2014 : Petition for approval of Tariff for Puducherry Power Corp. Ltd. Gas Power Station, (32.5MW) for the period 2014-15 arrppcl14-15 Edit (Size: 0.12MB )
Thursday, January 9, 2014
Petition No. 158/ 2014: Petition for approval of Business Plan for the Control Period FY 2015-16 to FY 2017-18 of Electricity Department, Govt of Puducherry BPEDP Edit (Size: 1.47MB )
Wednesday, January 1, 2014
Petition No. 120/2013 : Aggregate Revenue Requirement and Tariff petition for FY 2014-15 ARRDNHFY14-15 Edit (Size: 0.63MB )
revisedarrdnh Edit (Size: 0.69MB )
formatDNHFY14-15 Edit (Size: 0.27MB )
Tuesday, November 26, 2013
Petition No. 119/2013 : Petition filed under Section 86(1)(c) and Section 142 of the Electricity Act, 2003 read with JERC (Open Access in Transmission and Distribution) Regulations, 2009 petitionperfectfila Edit (Size: 0.16MB )
Monday, November 11, 2013
Petition No. 114/2013 : Aggregate Revenue Requirement and Tariff petition for FY 2014-15 arrddnov Edit (Size: 0.89MB )
Friday, November 1, 2013
Petition No. 110/2013 : Petition for seeking determination of Preferential Tariff under Net Metering for Rooftop Solar Photovoltaic Power Projects of CREST and for sale of such power to the Electricity Department of UT Chandigarh under section 61, 62, 86 and 181 of the Electricity Act, 2003 and as per Joint Electricity Regulatory Commission for State of Goa & Union Territories (Procurement of Renewable Energy) Regulations 2010. gepart1 Edit (Size: 3.43MB )
crestpetition Edit (Size: 0.04MB )
DPRHT Edit (Size: 0.29MB )
DPRLT Edit (Size: 0.27MB )
PCM Edit (Size: 0.03MB )
SPV Edit (Size: 0.02MB )
Sunday, September 29, 2013
Petition No. 103/2013 : Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 gepart1 Edit (Size: 3.43MB )
gepart2 Edit (Size: 3.50MB )
gepart3 Edit (Size: 3.31MB )
gepart4 Edit (Size: 3.40MB )
gepart5 Edit (Size: 3.31MB )
gepart6 Edit (Size: 3.50MB )
gepart7 Edit (Size: 3.42MB )
gepart8 Edit (Size: 3.47MB )
gepart9 Edit (Size: 2.21MB )
corriglobal Edit (Size: 0.13MB )
Monday, May 6, 2013
Petition No. 101/2013 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRLKD Edit (Size: 0.23MB )
AnnexureI Edit (Size: 0.37MB )
FomatsLKD2 Edit (Size: 0.13MB )
Tuesday, April 9, 2013
Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003 resaheliapr Edit (Size: 0.22MB )
Monday, April 8, 2013
Petition No. 100/2013 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRCHDFY2013-14 Edit (Size: 1.19MB )
Friday, February 15, 2013
Petition No. 96/2013 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRPUDUCHERRFY2013-14 Edit (Size: 1.34MB )
Friday, February 8, 2013
Petition No. 99/2013 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRGOAFY2013-14 Edit (Size: 2.84MB )
Tuesday, February 5, 2013
Petition No. 98/2013 : Petition for approval of Tariff for Karaikal Gas Power Station, (32.5MW) for the period 2013-14 ppclfy2013-14 Edit (Size: 0.14MB )
Tuesday, February 5, 2013
Petition No. 93/2013 : Petition for approval of Power Purchase Agreement (PPA) between Electricity Department, Andaman & Nicobar Administration, and NTPC Ltd. 5mwntpc Edit (Size: 0.31MB )
Monday, January 14, 2013
Petition No. 94/2013 : Petition for approval of Power Purchase Agreement between Electricity Department, Andaman & Nicobar Administration and M/s Surya Chakra Green Fuel Ltd under section 86 (1) (b) of Electricity Act, 2003 2MW Edit (Size: 0.32MB )
annx94 Edit (Size: 0.31MB )
DPR Edit (Size: 1.05MB )
Thursday, January 10, 2013
Petition No. 92/2012 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRDNHFY2013-14 Edit (Size: 1.10MB )
Friday, November 30, 2012
Petition No. 90/2012 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRDDFY2013-14 Edit (Size: 0.67MB )
Friday, November 30, 2012
Petition No. 91/2012 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRANIFY2013-14 Edit (Size: 1.87MB )
Thursday, November 29, 2012
Petition No. 89/2012 : PETITION FOR APPROVAL OF COMPLETED/ACTUAL CAPITAL COST OF THE PROJECT AND TARIFF OF THE PETITIONER – A POWER GENERATING COMPANY - UNDER REGULATIONS 3(2)(a), 3(4), 12, AND 36 OF THE JOINT ELECTRICITY REGULATORY COMMISSION FOR THE STATE OF GOA AND UNION TERRITORIES (TERMS AND CONDITIONS FOR DETERMINATION OF TARIFF) REGULATIONS, 2009 READ WITH SECTIONS 62 (1) (a) AND 63 OF THE ELECTRICITY ACT, 2003 ARRSURYAFY2013-14 Edit (Size: 0.24MB )
Thursday, November 29, 2012
Petition No. 85/2012 : Aggregate Revenue Requirement and Tariff petition for FY 2012-13 arrlkd12-13 Edit (Size: 1.03MB )
Wednesday, August 1, 2012
Petition No.63/2012 : True up Petition on Tariff Order of JERC for FY 2010-11 damantrueup Edit (Size: 0.15MB )
Tuesday, February 14, 2012
Petition No. 70/2012 : Aggregate Revenue Requirement and Tariff petition for FY 2012-13 GOAARRFY2012-13 Edit (Size: 0.63MB )
Wednesday, January 25, 2012
Petition No. 66/2012 : Petition for determination of Project Specific Preferential Tariff for Roof Top Solar Photo Voltaic Project for sale of such power to ED, DNH. PetitionIMPPL Edit (Size: 0.67MB )
Monday, January 9, 2012
Petition No.64/2012 : Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2012-13. binder Edit (Size: 2.87MB )
Friday, December 30, 2011
Petition No. 63/2012: Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2012-13. DDARRFY2012-13 Edit (Size: 0.70MB )
Wednesday, November 30, 2011
Petition No. 62/2012: Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2012-13. dnharrfy2012-13 Edit (Size: 0.60MB )
Wednesday, November 30, 2011
Petition No. 65/2012: Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2012-13. aniarrfy2012-13 Edit (Size: 0.59MB )
Monday, November 28, 2011
Petition No. 60/2011: Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2012-13. EDPARRFY12-13 Edit (Size: 1.95MB )
Wednesday, November 23, 2011
Petition No. 40/2011: Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2011-12. petitiongoa1312 Edit (Size: 2.11MB )
Monday, October 24, 2011
Petition No. 39 /2011: Determination of Tariff for 1.0 MW Power from rooftop PV & Small Solar Power Generation (RPSSGP) for supply to the Puducherry Utility by Saheli Exports Pvt. Ltd. sahelipetition1 Edit (Size: 3.67MB )
Tuesday, June 28, 2011
Petition No. 72/2012 : Petition for Power Purchase Agreement for Procurement of 5 MW from new Grid Connected Solar Project on Long Term basis (Under New Project Scheme) between Electricity Department Daman & Diu and M/s Waaree Energies Pvt Ltd. SOLAR2552012 Edit (Size: 0.80MB )
Monday, March 14, 2011
Label
If you are not able to view the document: Click here to Adobe Reader Download
Note:- If the script is disabled, PDF preview function will get affected in some browsers .
Label

Joint Electricity Regulatory Commission
rajat.katiyar@uneecops.com
Goa link Andaman and Nicobar link Chandigarh link Dadar and Nagar Haveli link Daman and Diu link Puducherry link Lakshadweep link