Sr No. Title Petitioner Date of Hearing
1 Petition No. 174/2015 :Complaint under Section 142 of the Electricity Act, 2003 read with Regulation 70 of the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Conduct of business) Regulations, 2009 and the matter of admitted for hearing on 10.08.2015. M/s Suryachakra Power Corporation Ltd. Thursday, November 17, 2016
2 Petition No. 219/2016 :Petition for seeking approval of Capital Expenditure for Smart Grid Project under National Smart Grid Mission- Rs.28.58 Crores. Electricity Department, Chandigarh Tuesday, November 8, 2016
3 Petition No. 217.Application for Recall of the Order of the Commission dated 26.07.2016 in the matter of Filing of ARR for MYT Determination for the Control Period FY 2015-16 to FY 2017-18 under Section 61, 62 and 64 of the EA, 2003 Rajan Solanki, President, Lok Janshakti Party, Silvassa Tuesday, October 25, 2016
4 Petition No. 210/2016, Petition against the use of dedicated distribution system/feeder by ED, Goa invested and installed by M/s. Deccan Fine Chemicals (India) Pvt. Ltd,.(formerly Syngenta India Limited) filed u/s 94 of the EA, 2003 and Regulations 74 (a) of JERC (Conduct of Business) Regulations 2009 and Regulation 11.6 of JERC (Electricity Supply Code) Regulations, 2010. Deccan Fine Chemicals (India) Pvt. Ltd. Tuesday, October 25, 2016
5 petition no. 218/2016 :Review Petition under Section 94 (1) (f) of the Electricity Act, 2003 in the matter of True up of Annual Revenue Requirement for the year 2014-15, Reviewing the Annual Revenue Requirement for the year 2015-16 and approval of the Annual Revenue Requirement for the MYT Control Period FY 2016-17 to FY 2018-19 and Determination of tariff for the year 2016-17. DNH Power Distribution Corporation Limited Tuesday, October 4, 2016
6 petition No. 217/2016 Application for recall of the order of the Hon'ble Commission dated 26.07.2016 in the matter of filing of ARR for MYT Determination for the Control Period FY 2015-16 to FY 2017-18 under Section 61, 62 and 64 of the EA, 2003 Rajan Solanki, President, Lok Janshakti Party, Silvassa Friday, September 23, 2016
7 Petition no. 208/2016, Petition for approval of tariff of 1MW Grid connected Roof-top Solar PV project in Andaman & Nicobar Islands under Section 62 and 83(4) of the EA, 2003 and under regulation 21,57,58,59 and 60 of the JERC (Solar Power Grid Connected Ground Mounted and Solar Rooftop and Metering) Regulations, 2015. . Solar Energy Corporation of India Ltd Tuesday, July 26, 2016
8 Petition No. 209/2016, Review Petition in respect of Tariff Order FY 2016-17 dated 28th April, 2016 issued by Hon’ble JERC for the UT Chandigarh Electricity Department, Chandigarh Tuesday, July 26, 2016
9 Petition No. 175/2015 : Petition under Non-Compliance of Solar RPO specified under Regulation 1 -Quantum of Renewable Purchase Obligation -RPO- of JERC (Procurement of Renewable Energy) Regulations, 2010 by Obligated Entities for FY 2010-11 and 2014-15 and in the matter of application under Section 142 of the EA 2003 and Section 146 of the EA 2003, and Regulation 4 of the JERC (Procurement of Renewable Energy ) Regulations, 2010 and subsequent amendment called JERC for Goa & UTs (Procurement of Renewable Energy ) First Amendment Regulations, 2014 Green Energy Association Tuesday, July 26, 2016
10 Review of Cross Subsidy Surcharge Determination notified in Hon’ble JERC Tariff Order dated 06.04.2016 for Daman & Diu, under Regulation 74 of JERC (Conduct of Business) Regulations, 2009 . WellKnown Polyester Ltd. Monday, July 25, 2016
11 Petition No. 202/2016: Application for direction to be issued on the Respondent to treat certain assets as part of the Transmission asset and to be taken out of the assets of DNHPDCL. Rajan Solanki, President, Lok Janshakti Party, Silvassa Thursday, July 14, 2016
12 Petition no. 207/2016- Petition under Section 61, 62 of the EA, 2003 for approval of implementation of DSM based efficient programme (DELP) in the circle of operation of ED, A&N under Demand Side Management Programme. Electricity Department, A&N Thursday, July 14, 2016
13 Review of Cross Subsidy Surcharge Determination notified in Hon’ble JERC Tariff Order dated 06.04.2016 for Daman & Diu, under Regulation 74 of JERC (Conduct of Business) Regulations, 2009 . M/s Wellknown polyester. Petitioner WellKnown Polyester Ltd. Thursday, June 9, 2016
14 Petition for seeking approval of Hon’ble JERC for determination of additional surcharge payable by Open Access Consumers availing power under Open Access as per JERC (Open Access in Transmission and Distribution) Regulations, 2009 DNH- Power Distribution Corporation Ltd. Thursday, June 9, 2016
15 Petition No. 175/2015 : Petition under Non-Compliance of Solar RPO specified under Regulation 1 -Quantum of Renewable Purchase Obligation -RPO- of JERC (Procurement of Renewable Energy) Regulations, 2010 by Obligated Entities for FY 2010-11 and 2014-15 and in the matter of application under Section 142 of the EA 2003 and Section 146 of the EA 2003, and Regulation 4 of the JERC (Procurement of Renewable Energy ) Regulations, 2010 and subsequent amendment called JERC for Goa & UTs (Procurement of Renewable Energy ) first amendment Regulations, 2014 Green Energy Association Friday, May 27, 2016
16 Petition No. 201/2016 : Filing of Petition for seeking relief from the restriction on grid penetration upon 30% of the Distribution Transformer Capacity (DTC) for the projects commissioned before the Solar Power-Grid Connected Ground Mounted and Solar Rooftop and Metering Regulations, 2015 came to the existence and also to allow the grid penetration up to at least 50% of DTC for further projects 2. To allow the net metering of the Solar Power plants without converting its output on to 11 KV side for the projects already commissioned before the Solar Power-Grid Connected Ground Mounted and Solar Rooftop and Metering Regulations, 2015 came to the existence and in cases where the captive consumption is more than the 3-4 times of the solar power generation then in such cases connection of solar power plant on 11 KV side may be dispensed with. The Director,(S&T) and Chief Executive Officer (CREST), Chandigarh. Friday, May 13, 2016
17 Petition No. 200/2016 : Petition for approval of Draft Solar Net / Gross Metering Power Purchase Agreement (PPA) The Superintending Engineer, Chandigarh. Friday, May 13, 2016
18 Petition No. 202/2016 : Application for direction to be issued on the Respondent to treat certain assets as part of the Transmission asset and to be taken out of the assets of DNHPDCL Petition No. 202/2016 : Application for direction to be issued on the Respondent to treat certain assets as part of the Transmission asset and to be taken out of the assets of DNHPDCL And in the matter of President, Lok Janshakti Party, Silvassa Thursday, May 12, 2016
19 Petition No. 184/2015 : Petition under Section (1) (f) of Electricity Act, 2003 for directions to the Govt. of Goa, Respondent to take network over laid by the Reliance Infrastructur Limited, Petitioner for supply of electricity to consumers in the area of supply in which the Respondents holds a license under Section 14 of Electrcity Act, 2003 and related matters. M/s Reliance Infrastructure Limited a company incorporated under the provisions of the Companies Act, 1956 having its Registered Office at H Block, 1st Floor, Dhirubhai Ambani Kwoledge City, Navi Mumbai 400719 and having its plant Office at Goa Power Station, Opp. Sacoale Industries Estate, Zuarinagar, Goa 403726. Thursday, May 12, 2016
20 Petition No. 174/2015 : Complaint under Section 142 of the Electricity Act, 2003 read with Regulations 70 of the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Conduct of Business) Regulations, 2009 M/s Suryachakra Power Corporation Ltd Tuesday, May 3, 2016
21 Petition No. 199/2016 : Seeking approval of the Hon'ble Commission for the Implementation of Smart Grid Pilot Project in Puducherry Superintending Engineer -I Electricity Department , Puducherry Monday, April 25, 2016
22 Petition No. 184/2015 : Petition under Section (1) (f) of Electricity Act, 2003 for directions to the Govt. of Goa, Respondent to take network over laid by the Reliance Infrastructur Limited, Petitioner for supply of electricity to consumers in the area of supply in which the Respondents holds a license under Section 14 of Electrcity Act, 2003 and related matters. M/s Reliance Infrastructure Limited a company incorporated under the provisions of the Companies Act, 1956 having its Registered Office at H Block, 1st Floor, Dhirubhai Ambani Kwoledge City, Navi Mumbai 400719 and having its plant Office at Goa Power Station, Opp. Sacoale Industries Estate, Zuarinagar, Goa 403726. Tuesday, April 19, 2016
23 Petition No. 184/2015 : Petition under Section (1) (f) of Electricity Act, 2003 for directions to the Govt. of Goa, Respondent to take network over laid by the Reliance Infrastructur Limited, Petitioner for supply of electricity to consumers in the area of supply in which the Respondents holds a license under Section 14 of Electrcity Act, 2003 and related matters. M/s Reliance Infrastructure Limited a company incorporated under the provisions of the Companies Act, 1956 having its Registered Office at H Block, 1st Floor, Dhirubhai Ambani Kwoledge City, Navi Mumbai 400719 and having its plant Office at Goa Power Station, Opp. Sacoale Industries Estate, Zuarinagar, Goa 403726 : Petitioner Vs 1. Electricity Department, Andaman & Nicobar Islands 2. The Chief Secretary, Andaman & Nicobar Islands Friday, February 5, 2016
24 Notice is hereby given to all stakeholders of the UT of Puducherry that Electricity Department Puducherry and Puducherry Power Corporation Ltd Petition No. 190/2016 for approval of True-up Petition of FY 2013-14, Provisional True-up Petition of FY 2014-15, Annual Performance Review of FY 2015-16 and Aggregate Revenue Requirement with Tariff Proposal for MYT Control Period FY 2016-17 to FY 2018-19 under Sections 61, 62 and 64 of the Electricity Act, 2003 filed by Electricity Department, Puducherry. Petition No. 191/2016 for approval of tariff for PPCL Gas Power Station (32.5MW) for the FY 2016-17 and True-up for FY 2013-14. Thursday, January 28, 2016
25 Petition No. 184/2015 : Petition under Section (1) (f) of Electricity Act, 2003 for directions to the Govt. of Goa, Respondent to take network over laid by the Reliance Infrastructur Limited, Petitioner for supply of electricity to consumers in the area of supply in which the Respondents holds a license under Section 14 of Electrcity Act, 2003 and related matters. M/s Reliance Infrastructure Limited a company incorporated under the provisions of the Companies Act, 1956 having its Registered Office at H Block, 1st Floor, Dhirubhai Ambani Kwoledge City, Navi Mumbai 400719 and having its plant Office at Goa Power Station, Opp. Sacoale Industries Estate, Zuarinagar, Goa 403726. Friday, January 8, 2016
26 Petition No. 170/2015 : Petition for review of Fuel & Power Purchase Cost Adjustment (FPPCPA) Formula for the Electricity Department of Goa under Regulation 7 (3) of JERC Tariff Regulations 2009 and FPPCA Order dated 27.06.2012 Electricity Department, Goa Thursday, January 7, 2016
27 Petition No. 167/2015 : Petition under Section 86 (1) (f) of Electricity Act, 2003 for direction to the Govt of Goa, Respondent to take over the network laid down by the M/s Reliance Infrastructure Limited a company incorporated under the provisions of the Companies Act, 1956 having its Registered Office at H Block, 1st Floor, Dhirubhai Ambani Kwoledge City, Navi Mumbai 400719 and having its plant Office at Goa Power Station, Opp. Sacoale Industries Estate, Zuarinagar, Goa 403726. Friday, December 11, 2015
28 Petition No. 184/2015 : Petition under Section (1) (f) of Electricity Act, 2003 for directions to the Govt. of Goa, Respondent to take network over laid by the Reliance Infrastructur Limited, Petitioner for supply of electricity to consumers in the area of supply in which the Respondents holds a license under Section 14 of Electrcity Act, 2003 and related matters. M/s Reliance Infrastructure Limited a company incorporated under the provisions of the Companies Act, 1956 having its Registered Office at H Block, 1st Floor, Dhirubhai Ambani Kwoledge City, Navi Mumbai 400719 and having its plant Office at Goa Power Station, Opp. Sacoale Industries Estate, Zuarinagar, Goa 403726. : Petitioner Vs Electricity Department, Goa Friday, December 11, 2015
29 Petition No. 188/2015 : Application of Condonation of delay in respect of Petition under Regulation 74 of JERC (Conduct of Business) Regulations, 2009 seeking review of the Tariff Order dated 30.03.2015 on Transmission Tariff for FY 2015-16 passed by the Commission. Association of Polyester Continuous Polymerization Industry of DNH Silvassa Wednesday, December 9, 2015
30 Petition No. 187/2015 : Seeking approval / concurrence of the Hon'ble Commission under Regulations 60 (C) of the JERC (Conduct of Business) Regulations, 2009 for the Power Purchase Agreement to be entered into by the Electricity Department, Government of Puducherry (EDP) with NLC Thermal Power Station -II [2nd Expansion ) (2X500) MW] Electricity Department, Puducherry Friday, November 27, 2015
31 Petition No. 179/2015 : Petition for Approval of Tariff and Agreement for supply of surplus power from biomass based captive power plant of Merck Limited to Electricity Department, Govt. of Goa MERCK Limited, Shiv Sagar Estate-A, Dr. Annei Besant Road, Worli, Mumbai-400018 Monday, November 9, 2015
32 Public Notice Notice is hereby given to all interested persons that Electricity Department of UT of Puducherry has filed a petition for approval of its Business Plan for the MYT (Control Period FY 2016-17 to FY 2018-19) under JERC (Multi Year Distribution Tariff) Regulations, 2014 and amendments thereon. The same has been admitted under Petition No. 181/2015 and is available on Commission’s website www.jercuts.gov.in The Commission will conduct Public Hearing on 8th October at Puducherry and 9th October, 2015 at Karaikal (i) on the above matter, and (ii) have interaction with various stake holders on the provisions of JERC Solar Power Regulations, 2015 as per schedule given below: Date and Time Venue 08.10.2015 09.30 Hrs to 12.30Hrs PMSSS Hall, No.-81, Laporte Street, Puducherry -605001 09.10.2015 09.30 Hrs to 11.00Hrs Danal K.A. Thangavelu Kalaiyarangam, Theitta Street, Near Muncipality Marriage Hall, Karaikal. Thursday, October 8, 2015
33 Petition No. 167/2015 : Petition under Section (1) (f) of Electricity Act, 2003 And In the matter of M/s Reliance Infrastructure Limited a company incorporated under the provisions of the Companies Act, 1956 having its Registered Office at H Block, 1st Floor, Dhirubhai Ambani Kwoledge City, Navi Mumbai 400719 and having its plant Office at Goa Power Station, Opp. Sacoale Industries Estate, Zuarinagar, Goa 403726. Electricity Department, Goa Tuesday, October 6, 2015
34 Petition No. 165/2015 : Review of Cross Subsidy Surcharge Determination notified in Hon 'ble JERC Tariff Order dated 31.03.2015 for Daman & Diu under Regulation 74 of JERC (Conduct of Business) Regulations, 2009. Well known Polyester Ltd. Dabhel Industrial Estate, Co-op Society, Dabhel, Daman : Petitioner And Electricity Department, Daman Thursday, June 25, 2015
35 Petition No. 89/2012 : Petition for approval of completed/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 M/s Suryachakra Power Corporation Ltd : Petitioner Vs 1. Electricity Department, Andaman & Nicobar Islands 2. The Chief Secretary, Andaman & Nicobar Islands Monday, January 12, 2015
36 Petition No. 61/2012 : Renewable Purchase Obligation Compliance of Procurement of Renewable Energy of Regulations,2010 JERC for Goa & UTs Secretary( Power), Govt. of Goa, Secretary (Power) UT of Andaman & Nicobar, Finance Secretary, UT of Chandigarh, Secretary (Power), UT of Dadra & Nagar Haveli Secretary(Power) , UT of Daman & Diu, Secretary( Power), UT of Lakshadweep, Secretary (Power), UT of Puducherry Wednesday, July 30, 2014
37 Petition No. 129/2014: Petition in respect of detailed study on manpower requirement at Chandigarh Electricity Department Electricity Department, Chandigarh Tuesday, June 24, 2014
38 Petition No. 130/2014: Petition for determination of Tariff for supply of surplus power from Co-generation Power Plant of Goa Sponge & Power Ltd to Electricity Department Goa. M/s Goa Sponge & Power Limited …Petitioner 542, Rafael House, Ponguirval, Currchorem, Goa Vs Electricity Department, Govt. of Goa Friday, May 30, 2014
39 Petition for seeking extension of time for the implementation of following JERC directions passed vide order dated 11.02.2014 in petition no. 127/2014. a) Framing of software and policy for pre-paid meters b) Acceptance of security deposit in form of Bank Guarantee. c) To pay interest at bank rate on the amount of security deposit / ACD charges from the date of commencement of Electricity Act, 2003. Superintending Engineer, Electricity OP Circle, Engineering Department, UT Secretariat, Deluxe Building, 1st Floor, Room No. 111, Sector 9-D, UT Chandigarh...... ... .....Petitioner Vs Chandigarh Industrial Area Tenant Association Friday, May 23, 2014
40 Petition No. 128/2013 : Petition for seeking approval for implementation of DSM based Efficient Lightning Program (DELP) in UT of Puducherry under Demand Side Management programme. Electricity Department, Puducherry Wednesday, February 5, 2014
41 Petition No. 110/2013 : Petition for seeking determination of Preferential Tariff under Net Metering for Rooftop Solar Photovoltaic Power Projects of CREST and for sale of such power to the Electricity Department of UT Chandigarh under section 61, 62, 86 and 181 of the Electricity Act, 2003 and as per Joint Electricity Regulatory Commission for State of Goa & Union Territories (Procurement of Renewable Energy) Regulations 2010. Chandigarh Renewal Energy Science & Technology Promotion Society (CREST) Ist Floor, Paryavaran Bhawan, Sector- 19, Chandigarh : Petitioner Vs Electricity Department, : Respondent UT, Chandigarh Tuesday, January 21, 2014
42 Petition No. 77/2012 : Consumers Metering, Reading and Billing. Electricity Department,Govt. of Goa Electricity Department,UT of Andaman & Nicobar Electricity Department,UT of Chandigarh Electricity Department,UT of Dadra and Nagar Haveli Electricity Department,UT of Daman & Diu Electricity Department,UT of Lakshadweep Electricity Department,UT of Puducherry Friday, December 27, 2013
43 Petition No. 110/2013 : Petition for seeking determination of Preferential Tariff under Net Metering for Rooftop Solar Photovoltaic Power Projects of CREST and for sale of such power to the Electricity Department of UT Chandigarh under section 61, 62, 86 and 181 of the Electricity Act, 2003 and as per Joint Electricity Regulatory Commission for State of Goa & Union Territories (Procurement of Renewable Energy) Regulations 2010 Chandigarh Renewal Energy Science & Technology Promotion Society (CREST) Ist Floor, Paryavaran Bhawan, Sector- 19, Chandigarh : Petitioner Vs Electricity Department, : Respondent UT, Chandigarh Friday, December 6, 2013
44 Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003. M/S Saheli Export Private Limited, Chennai. : Petitioner Vs 1.Electricity Department, Puducherry 2. Renewable Energy Agency Puducherry (REAP) :Respondents Thursday, November 28, 2013
45 Petition No. ----- : Petition for deferment of claim of Fuel and Power Cost Adjustment for the first quarter of the year 2013-14. Petition No. ----- : Petition for deferment of claim of Fuel and Power Cost Adjustment for the first quarter of the year 2013-14. Tuesday, October 29, 2013
46 Petition No. 61/2012 : Renewable Purchase Obligation Compliance of Procurement of Renewable Energy of Regulations,2010 JERC for Goa & UTs Secretary( Power), Govt. of Goa, Secretary (Power) UT of Andaman & Nicobar, Finance Secretary, UT of Chandigarh, Secretary (Power), UT of Dadra & Nagar Haveli Secretary(Power) , UT of Daman & Diu, Secretary( Power), UT of Lakshadweep, Secretary (Power), UT of Puducherry Friday, October 25, 2013
47 Petition No. 89/2012 : Petition for approval of completed/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 M/s Suryachakra Power Corporation Ltd : Petitioner Vs 1. Electricity Department, Andaman & Nicobar Islands 2. The Chief Secretary, Andaman & Nicobar Islands Thursday, September 19, 2013
48 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 M/s Suryachakra Power Corporation Ltd : Petitioner Vs 1. Electricity Department, Andaman & Nicobar Islands 2. The Chief Secretary, Andaman & Nicobar Islands Wednesday, June 26, 2013
49 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Electricity Department,Govt. of Goa Electricity Department,UT of Andaman & Nicobar Electricity Department,UT of Chandigarh Electricity Department,UT of Dadra and Nagar Haveli Electricity Department,UT of Daman & Diu Electricity Department,UT of Lakshadweep Electricity Department,UT of Puducherry Wednesday, April 17, 2013
50 Petition No. 18/2010 & 45/2011: Petition for review of order dated 06.08.2011 passed by the Hon'ble Commission in the matter of determination of tariff for Puducherry Power Corporation Limited (PPCL) Gas Power Station (32.5 MW) for the year FY 2011-12. Puducherry Power Corporation Limited (PPCL) Wednesday, April 17, 2013
51 Petition No. 18/2010 & 45/2011: Petition for review of order dated 06.08.2011 passed by the Hon'ble Commission in the matter of determination of tariff for Puducherry Power Corporation Limited (PPCL) Gas Power Station (32.5 MW) for the year FY 2011-12. Puducherry Power Corporation Limited (PPCL) Wednesday, February 27, 2013
52 Petition No. 87/2012 : Petition for seeking approval of Power Purchase Agreement proposed to be entered into by Electricity Department of Silvassa with EMCO Energy Ltd. Electricity Department UT of Dadra & Nagar Haveli Tuesday, February 19, 2013
53 Petition No. 19/2010 : Incremental Fuel Surcharge for the period from April, 2010 to October, 2010 for the Electricity Department Puducherry Electricity Department Puducherry : Petitioner Vs 1. Shri Travichandran, Executive Vice President, M/s Chemplast Sanmar . Ltd. 2.Shri K.V.Mohan, Counsel, M/s Chemplast Sanmar Ltd. Shri Gaurav Gupta,Counsel, M/s Chemfab Alkalis Ltd Monday, June 11, 2012
54 Petition No.63 : Filling of ARR and Tariff Proposal for the FY 2012-13. Electricity Department, Daman & Diu Friday, March 30, 2012
55 Petition No. 36/2011: Request to get exempted mentioned in the 8th provision of section 14 of the Electricity Act, 2003. Electricity Department, Lakshadweep Friday, November 25, 2011
56 Petition No. 36/2011: Request to get exemptions mentioned in the 8thproviso of section 14 of the electricity Act 2003. Collector and Development Commissioner and Secretary (Power) UT of Lakshadweep, Kavaratti Tuesday, October 18, 2011
57 Petition No. 41/2011: Non Compliance of Order dated 8.07.2011 on Petition No.28/2011 Electricity Department, Chandigarh Wednesday, August 24, 2011
Label
If you are not able to view the document: Click here to Adobe Reader Download
Note:- If the script is disabled, PDF preview function will get affected in some browsers .
Label

Joint Electricity Regulatory Commission
rajat.katiyar@uneecops.com
Goa link Andaman and Nicobar link Chandigarh link Dadar and Nagar Haveli link Daman and Diu link Puducherry link Lakshadweep link