1 |
Order Petition No. 113/2023: Petition under Section 27 of the Energy Conservation Act, 2001 for adjudication of the penalty under Section 26 of the Energy Conservation Act, 2001 by the Adjudicating Officer and for directions to Electricity Department, Government of Goa to make payment of penalty as adjudicated by the Adjudicating Officer. |
Petition No. 113/2023 |
20-09-2024 |
|
2 |
Petition No. 130/2014 : Petition for determination of Tariff supply of surplus power from Co-generation power plant of Goa Sponge & Power Ltd to Electricity Department Goa under Section 62 (1) (a) and 86 (1) (a) to (e) of the EA, 2003. |
Petition No. 130/2014 |
30-06-2024 |
|
3 |
INTERIM ORDER Petition No. 77/2012 Status of Consumer Metering and billing as per Regulation 8 of the Joint Electricity Regulatory Commission (for the State of Goa & Union Territories) (Electricity Supply Code) Regulation, 2018 and as amended from time to time. |
Petition No. 77/2012 |
21-11-2023 |
|
4 |
INTERIM ORDER Petition No. 61/2012: Compliane of the Joint Electricity Regulatory Commission (for the State of Goa & Union Territories) (Procurement of Renewable Energy) Regulations, 2010 regarding Renewable Purchase Obligation (RPO) and as amended from time to time. |
Petition No. 61/2012 |
21-11-2023 |
|
5 |
Compliane of the Joint Electricity Regulatory Commission (for the State of Goa & Union Territories) (Procurement of Renewable Energy) Regulations, 2010 regarding Renewable Purchase Obligation (RPO) and as amended from time to time. |
Petition No. 61/2012 |
14-11-2023 |
|
6 |
Order Petition No. 104/2023:Petition filed under Section 86(1)(b) & 86(1)(e) of the Electricity Act, 2003 for Determination of Levelized Generic Tariff in terms of Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyaan (PM-KUSUM) Scheme for setting up of grid connected solar power plants of individual capacity ranging between 500 kW to 2 MW in the State of Goa under Component–A of the scheme for sale of solar power generated thereof to the Electricity Department Goa in the State of Goa |
Petition No. 104/2023 |
22-06-2023 |
|
7 |
Order Petition No. 77/2022:Petition for approval for procurement of power by Electricity Department, Government of Goa from SECI 150 MW RE Hybrid (Wind , Solar & BESS) Power Plant. |
Petition No. 77/2022 |
31-01-2023 |
|
8 |
Application for the filing of Petition under Section 61,62 and 64 of the Electricity Act, 2003 read with all the multiple Regulations, under JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2021 for Determination of ARR for MYT Control Period (FY 2022-23 to FY 2024-25) and Determination of Tariff for FY 2023-24. |
Petition No. 77/2022 |
13-01-2023 |
|
9 |
GENERAL ORDER |
Petition No. GENERAL ORDER |
01-08-2022 |
|
10 |
Petton under Seceton 86()i) (b) and 86 ()i) (e) of the Elecetrcicecity Acet, 2003 for approlal for Long Term Proceurement of Power by Golt. of Goa of ceumulatle ceapacecity of )i)i0 MW Grcid Interacetle Solar PV Power Projecets, along wcith replaceement of )i)i,000 Conlentonal Agrciceultural Pumps by Energy Efcecient Agrciceulture Pumps and dcistrcibuton of )i6 Lakh Led Bulbs |
Petition No. 76/2022 |
08-04-2022 |
|
11 |
Petition No. 72/2021: Petition for approval of long-term procurement of power by Electricity Department, Government of Goa for 50 MW Wind Power under ISTS Wind Tranche VI |
Petition No. 72/2021 |
05-04-2022 |
|
12 |
Petition under Section 9, 42, 86 & other applicable provisions of the Electricity Act, 2003 read with the provisions of the JERC (Connectivity and Open Access in Intra-State Transmission and Distribution) Regulations, 2017 |
Petition No. 45/2021 |
15-06-2021 |
|
13 |
Petition against the use of dedicated distribution system/feeder by ED, Goa invested and installed by M/s. Deccan Fine Chemicals (India) Pvt. Ltd,.(formerly Syngenta India Limited) filed u/s 94 of the EA, 2003 and Regulations 74 (a) of JERC (Conduct of Business) Regulations 2009 and Regulation 11.6 of JERC (Electricity Supply Code) Regulations, 2010. |
Petition No. 210/2016 |
30-06-2017 |
|
14 |
Petition No. 210/2016, Petition against the use of dedicated distribution system/feeder by ED, Goa invested and installed by M/s. Deccan Fine Chemicals (India) Pvt. Ltd,.(formerly Syngenta India Limited) filed u/s 94 of the EA, 2003 and Regulations 74 (a) of JERC (Conduct of Business) Regulations 2009 and Regulation 11.6 of JERC (Electricity Supply Code) Regulations, 2010. |
Petition No. 210/2016 |
25-10-2016 |
|
15 |
Petition No. 210/2016, Petition against the use of dedicated distribution system/feeder by ED, Goa invested and installed by M/s. Deccan Fine Chemicals (India) Pvt. Ltd,.(formerly Syngenta India Limited) filed u/s 94 of the EA, 2003 and Regulations 74 (a) of JERC (Conduct of Business) Regulations 2009 and Regulation 11.6 of JERC (Electricity Supply Code) Regulations, 2010 |
Petition No. 210/2016 |
30-08-2016 |
|
16 |
Petition No. 210/2016, Petition against the use of dedicated distribution system/feeder by ED, Goa invested and installed by M/s. Deccan Fine Chemicals (India) Pvt. Ltd,.(formerly Syngenta India Limited) filed u/s 94 of the EA, 2003 and Regulations 74 (a) of JERC (Conduct of Business) Regulations 2009 and Regulation 11.6 of JERC (Electricity Supply Code) Regulations, 2010 |
Petition No. 210/2016 |
10-08-2016 |
|
17 |
Petition no. 208/2016, Petition for approval of tariff of 1MW Grid connected Roof-top Solar PV project in Andaman & Nicobar Islands under Section 62 and 83(4) of the EA, 2003 and under regulation 21,57,58,59 and 60 of the JERC (Solar Power Grid Connected Ground Mounted and Solar Rooftop and Metering) Regulations, 2015. . |
Petition No. 208/2016 |
26-07-2016 |
|
18 |
Petition No. 206/2016-Review Petition against Tariff Order (case no. 197 of2 016) issued in respect of ARR for the FY 2015-16, ARR for the 1st MYT Control Period (FY 2016-17 to FY 2018-19) and Wheeling and Retail Supply Tariff for FY 2016-17 FOR Electricity Department, Goa on 18th April 2016 Filed u/s 94 (1) (f) of the EA, 2003 and Regulation 74 (a) of JERC Conduct of Business Regulations, 2009 |
Petition No. 206/2016 |
14-07-2016 |
|
19 |
Petition No. 184/2015 :Petition under Section 86 (1) (f) of Electricity Act, 2003 for directions to the Government of Goa, Respondent to take over the network laid down by the Reliance Infrastructure Limited, Petitioner for supply of electricity to consumers in the area of supply in which the Respondent holds a license under Section 14 of the Electricity Act, 2003 and related matters |
Petition No. 184/2015 |
11-12-2015 |
|
20 |
Petition No. 167/2015 : Petition under Section (1) (f) of Electricity Act, 2003 |
Petition No. 167/2015 |
11-12-2015 |
|
21 |
Petition No. 184/2015 :Petition under Section 86 (1) (f) of Electricity Act, 2003 for directions to the Government of Goa, Respondent to take over the network laid down by the Reliance Infrastructure Limited, Petitioner for supply of electricity to consumers in the area of supply in which the Respondent holds a license under Section 14 of the Electricity Act, 2003 and related matters |
Petition No. 184/2015 |
27-10-2015 |
|
22 |
Petition No. 184/2015 :Petition under Section 86 (1) (f) of Electricity Act, 2003 for directions to the Government of Goa, Respondent to take over the network laid down by the Reliance Infrastructure Limited, Petitioner for supply of electricity to consumers in the area of supply in which the Respondent holds a license under Section 14 of the Electricity Act, 2003 and related matters |
Petition No. 184/2015 |
06-10-2015 |
|
23 |
Petition No. 179 /2015 : Petition under Sections 62 (1) (a) and 86 (1) (a) (b) & (e) of the Electricity Act, 2003 for approval of tariff and agreement for supply of surplus power from Biomass Based Capative Power Plant of the Petitioner Merck Limited to Respondent Electricity Department, Govt. of Goa |
Petition No. 179/215 |
06-10-2015 |
|
24 |
Petition No. 172/2015 : Review Petition against Tariff Order (Case No. 160 & 161 of 2015) issued in respect of Annual Performance Review (APR) of FY 2014-15 and Aggregate Revenue Requirement (ARR) & Tariff Proposal for FY 2015-16 for Electricity Department, Goa dated 6th April, 2015. |
Petition No. 172/2015 |
29-06-2015 |
|
25 |
Petition No. 169/2015 : Review Petition against Tariff Order (CaseNo. 160 & 161 of 2015) issued in respect of Annual Performance Review (APR) of FY 2014-15 and Aggregate Revenue Requirement CARR) & Tariff Proposal for FY 2015-16 for Electricity Department, Goa dated 6th April, 2015 |
Petition No. 169/2015 |
29-06-2015 |
|
26 |
Petition No. 168/2015 : Review Petition against Tariff Order (Case No. 160 & 161 of 2015) issued in respect of Annual Performance Review (APR) of FY 2014-15 and Aggregate Revenue Requirement CARR) & Tariff Proposal for FY 2015-16 for Electricity Department, Goa dated 6th April, 2015. |
Petition No. 168/2015 |
29-06-2015 |
|
27 |
Petition No. 167/2015 : Petition under Section (1) (f) of Electricity Act, 2003 |
Petition No. 167/2015 |
29-06-2015 |
|
28 |
Petition No. 166/2015 : Review Petition against Tariff Order (Case No. 160 & 161 of 2015) issued in respect of Annual Performance Review (APR) of FY 2014-15 and Aggregate Revenue Requirement CARR) & Tariff Proposal for FY 2015-16 for Electricity Department, Goa dated 6th April, 2015. |
Petition No. 166/2015 |
29-06-2015 |
|
29 |
Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 |
Petition No. 89/2015 |
16-03-2015 |
|
30 |
Petition No. 61/2012 : Compliance of Joint Electricity Regulatory Commission for the State of Goa and UTs (Procurement of Renewable Energy) Regulation 2010 regarding Renewable Purchase Obligation (RPO). |
Petition No. 61/2012 |
12-11-2014 |
|
31 |
Petition No. 130/ 2014 :Petition for determination of Tariff for supply of surplus power from Co-generation power plant of Goa Sponge & Power Ltd. to Electricity Department Goa under Section 62( 1) (a) and 86 (1) (a) to (e) of the EA 2003 |
Petition No. 130/2014 |
23-08-2014 |
|
32 |
Petition No. 130/2014 : Petition for determination of Tariff supply of surplus power from Co-generation power plant of Goa Sponge & Power Ltd to Electricity Department Goa under Section 62 (1) (a) and 86 (1) (a) to (e) of the EA, 2003. |
Petition No. 130/2014 |
21-08-2014 |
|
33 |
Petition No. 130/2014 : Petition for determination of Tariff supply of surplus power from Co-generation power plant of Goa Sponge & Power Ltd to Electricity Department Goa under Section 62 (1) (a) and 86 (1) (a) to (e) of the EA, 2003 |
Petition No. 130/2014 |
13-07-2014 |
|
34 |
Petition No. 135/ 2014 :Review petition against the order dated 15.04.2014 passed by Hon’ble JERC. |
Petition No. 135/ 2014 |
08-07-2014 |
|
35 |
Petition No. 76/2012 : Loss Reduction Programme as per Regulation 15 of JERC for the State of Goa and UTs (terms and Conditions for determination of tariff Regulations, 2009 |
Petition No. 76/2012 |
05-05-2014 |
|
36 |
Petition No. 130/2014 : Petition for determination of Tariff supply of surplus power from Co-generation power plant of Goa Sponge & Power Ltd to Electricity Department Goa under Section 62 (1) (a) and 86 (1) (a) to (e) of the EA, 2003. |
Petition No. 130/2014 |
05-05-2014 |
|
37 |
Petition No. 76/2012 : Loss Reduction Programme as per Regulation 15 of JERC for the State of Goa and UTs (terms and Conditions for determination of tariff Regulations, 2009 |
Petition No. 76/2012 |
06-01-2014 |
|
38 |
Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. |
Petition No. 11/2011 |
29-10-2013 |
|
39 |
Petition No. 76/2012 : Loss reduction programme |
Petition No. 76/2012 |
25-10-2013 |
|
40 |
Petition No. 103/2013 Petition for grant of Intra-State Trading Licence under Section 14 of the Electricity Act, 2003 in the State of Goa by Global Energy. |
Petition No. Petition No. 103/2013 |
26-09-2013 |
|
41 |
Petition No. 105/2013- Petition for approval of Power Purchase Agreement between Electricity Department, Govt. of Goa and Sesa Goa Ltd. under section 86(1) of the Electricity Act, 2003 read with Regulation 60 (c) of JERC (Conduct of Business) Regulations, 2009 |
Petition No. 105/2013 |
19-09-2013 |
|
42 |
Petition No-106/2013 Petition for seeking relaxation of Regulation 6.10 (2) of JERC (Electricity Supply Code) Regulations, 2010 to the extent of allowing of Security Deposit in the form of Bank Guarantee instead of Demand Draft or Banker's Cheque for H. T. Industrial ( Ferro Metallurgical / Steel Meeting / Power Intensive ) & H. T. Industrial (Steel Rolling) categories as per JERC Tariff order dated 31.03.2013 for ED-Goa |
Petition No. 106/2013 |
09-09-2013 |
|
43 |
Petition No. 103/2013 Petition for grant of Intra-State Trading Licence under Section 14 of the Electricity Act, 2003 in the State of Goa by Global Energy. |
Petition No. 103/2013 |
19-08-2013 |
|
44 |
Petition No. 105/2013- Petition for approval of Power Purchase Agreement between Electricity Department, Govt. of Goa and Sesa Goa Ltd. under section 86(1) of the Electricity Act, 2003 read with Regulation 60 (c) of JERC (Conduct of Business) Regulations, 2009. |
Petition No. 105/2013 |
19-08-2013 |
|
45 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. |
Petition No. 68/2012 |
05-08-2013 |
|
46 |
Petition No-106/2013 Petition for seeking relaxation of Regulation 6.10 (2) of JERC (Electricity Supply Code) Regulations, 2010 to the extent of allowing of Security Deposit in the form of Bank Guarantee instead of Demand Draft or Banker's Cheque for H. T. Industrial ( Ferro Metallurgical / Steel Meeting / Power Intensive ) & H. T. Industrial (Steel Rolling) categories as per JERC Tariff order dated 31.03.2013 for ED-Goa. |
Petition No. 106/2013 |
29-07-2013 |
|
47 |
Petition No. 105/2013- Petition for approval of Power Purchase Agreement between Electricity Department, Govt. of Goa and Sesa Goa Ltd. under section 86(1) of the Electricity Act, 2003 read with Regulation 60 (c) of JERC (Conduct of Business) Regulations, 2009. |
Petition No. 105/2013 |
29-07-2013 |
|
48 |
Petition No. 76/2012 : Loss reduction programme. |
Petition No. 76/2012 |
10-07-2013 |
|
49 |
Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations. |
Petition No. 78/2012 |
08-07-2013 |
|
50 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. |
Petition No. 68/2012 |
14-06-2013 |
|
51 |
Petition No. 77/2012 : Consumer metering, reading and billing category wise |
Petition No. 77/2012 |
27-05-2013 |
|
52 |
Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations |
Petition No. 78/2012 |
30-04-2013 |
|
53 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections |
Petition No. 68/2012 |
17-04-2013 |
|
54 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections |
Petition No. 68/2012 |
27-02-2013 |
|
55 |
Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations |
Petition No. 78/2012 |
19-02-2013 |
|
56 |
Petition No. 95/2013 : Review petition in the matter of Tariff Order dated 27th June, 2012 of Hon'ble JERC for FY 2012-13 for Electricity Department, Goa |
Petition No. 95/2013 |
30-01-2013 |
|
57 |
Petition No. 75/2012 : Standard of Performance (SOP) Non-submission of monthly / quarterly and annual report. |
Petition No. 75/2012 |
30-01-2013 |
|
58 |
Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. |
Petition No. 68/2012 |
26-11-2012 |
|
59 |
Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. |
Petition No. 11/2011 |
26-06-2012 |
|
60 |
Petition No. 76/2012 : Loss reduction Programme |
Petition No. 76/2012 |
22-06-2012 |
|
61 |
Petition No. 78/2012 : Operationalization of Open Access |
Petition No. 78/2012 |
22-06-2012 |
|
62 |
Petition No. 77/2012 : Status of Consumer metering, Reading and Billing category wise. |
Petition No. 77/2012 |
21-06-2012 |
|
63 |
Petition No. 75/2012 : Standard of Performance (SOP) Non-submission of monthly /quarterly and annual report |
Petition No. 75/2012 |
21-06-2012 |
|
64 |
Approval of Aggregate Revenue Requirement and Tariff Proposal for the FY 2011-12 and FY 2012-13. |
Petition No. 40/2011 &70/2012 |
13-04-2012 |
|
65 |
Approval of Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2011-12 and FY 2012-13. |
Petition No. 70/2012 |
12-03-2012 |
|
66 |
Petition No. 11/2011: Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity |
Petition No. 11/2011 |
18-10-2011 |
|
67 |
Petition No. 11/2010:Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon’ble Appellate Tribunal for Electricity. |
Petition No. 11/2010 |
23-08-2011 |
|
68 |
Petition No. 11/2010 : Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity. |
Petition No. 11/2010 |
08-07-2011 |
|
69 |
Petition No. 23/2011:Designation of agency as State Agency for accreditation and recommending the renewable energy projects for registration. Compliance of regulation 3.1 of the JERC (Procurement of Renewable Energy) Regulations, 2010. |
Petition No. 23/2011 |
15-04-2011 |
|
70 |
Filing of the Tariff Petition for the FY 2011 - 12 Compliance of JERC for the State of Goa and UTs (Terms and Conditions for Determination of Tariff) Regulations, 2009. |
Petition No. 22/2010 |
09-02-2011 |
|
71 |
Petition in respect of illegal disconnection of their installation HTC-44 Goa in violation of section 56 (1)(b) of Electricity Act 2003.1.M/S Sardessai Engineering Works |
Petition No. 12/2010 |
12-07-2010 |
|
72 |
Petition in respect of illegal disconnection of their installation HTC-44 Goa in violation of section 56 (1)(b) of Electricity Act 2003.1.M/S Sardessai Engineering Works |
Petition No. 12/2010 |
15-06-2010 |
|
73 |
Petition in respect of illegal disconnection of their installation HTC-44 Goa in violation of section 56 (1)(b) of Electricity Act 2003.1.M/S Sardessai Engineering Workspetitin |
Petition No. 12/2010 |
14-05-2010 |
|