1 |
Petition No. 124/2024 |
Electricity Department, DNH (Transmission Divsion) |
Approval of Annual Revenue Requirement (ARR) Petition and Tariff Petition of Electricity Department (Transmission Division) of Dadra & Nagar Haveli for FY 2024-25 under Section 61, 62 and 64 of the Electricity Act, 2003 |
01/15/2024 |
|
2 |
Petition No. 123/2024 |
Electricity Department, Daman & Diu |
Petition for Approval of True-up of FY 2022-23, Review of FY 2023-24 and ARR and Determination of Transmission Tariff for FY 2024-25 for Electricity Department, Daman & Diu under Section 61, 62 and 64 of the Electricity Act, 2003. |
01/15/2024 |
|
3 |
Petition No. 122/2024 |
DNHDDPCL |
Filling of Aggregate Revenue Requirement (ARR) for FY 2024- 25 under Section 61,62 and 64 of the Electricity Act,2003. |
01/15/2024 |
|
4 |
Petition No.119/2024 |
Electricity Department, Andaman & Nicoba |
Petition for Approval of Petition for Approval of True- up for the FY 2021-22, APR for the FY 2023-24 &ARR & Tariff Proposal FY 2024-25. |
01/03/2024 |
|
5 |
Petition No. 22/2019 |
Electricity Department of Daman & Diu (hereinafter referred to as "EDDD" or "The Petitioner") Daman - Applicant |
Filling of Aggregate Revenue Requirement(ARR) for FY 2020-21 under section 62 and 86 of the Electricity Act,2003 |
12/09/2023 |
|
6 |
Petition No. 118/2023 |
Electricity Department, Lakshadweep |
Petition for True-up for FY 2019-20, Annual Performance Review for FY 2023-24 and ARR & Tariff Proposal for FY 2024-25- Reg |
12/07/2023 |
|
7 |
Petition No. 116/2023 |
Electricity Department, Puducherry |
Petition for Approval of True-up of FY 2022-23, Annual Performance Review of 2023-24 and Aggregate Revenue Requirement (ARR) and Determination of Tariff for FY 2024-25 of Electricity Department, Govt. of Puducherry |
12/01/2023 |
|
8 |
Petition No. 115/2023 |
Electricity Department, Goa |
Petition for approval of True-up of FY 2022-23, APR of FY 2023-24, ARR for FY 2024-25, and Tariff Proposal for FY 2024-25. |
11/30/2023 |
|
9 |
Petition No. 117/2023 |
DNHDDPDCL |
Petition for Approval for True-up of FY 2022-23, Annual Performance Review of FY 2023-24 and Determination of Aggregate Revenue Requirement & Tariff for FY 2024-25 for the Distribution Business of Dadra & Nagar Haveli and Daman & Diu along with Audited Accounts of FY 2022-23 |
11/29/2023 |
|
10 |
Petition No. 120/2013 |
Electricity Department ,Transmission Division,UT of Dadra and Nagar Haveli |
Electricity Department of Dadra & Nagar Haveli ANNUAL REVENUE REQUIREMENT FOR THE YEAR FY 14-15 Interest Capitalized |
11/26/2023 |
|
11 |
Petition No.88/2022 |
The Managing Director, Puducherry Power Corporation Ltd.(PPCL), #10, Second Cross, Jawahar Nagar, Boomianpet, Puducherry-5O5 005. |
MYT Petition under Section 62 and 83 [4J ofthe Electricity Act 2003 read with chapter-ll of the foint Electricity Regulatory Commission [Terms & Conditions for Determination of TariffJ Regulations, 2009 for approval of Tariff for Karaikal Gas Power Station, (32.5 MW) for the control period. 2023 -24 to 2024-25. |
11/23/2023 |
|
12 |
Petition No:114/2023 |
Puducherry Power Corporation Limited (PPCL) |
MYT Petition for determination and approval of tariff of PPCL Gas Power Station (32.5 l W) for the control period 2024-25 along with Annual Performance Review for the FY 2023-24, Revision of Tariff for the period 01.04.2021 to 31.O3.2O22 after the Provisional truing up exercise and Revision of Tariff for the period 01 .04. 2022 to 3 1 .03 .2023 after the Provisional truing up exercise |
11/20/2023 |
|
13 |
Petition No. 102/2023 |
Electricity Department of,Goa. |
Petition for approval of True-Up FY-2020-21 & FY 2021-22 by Electricity Department,Govt of GOA and Note to submssion with respect to hearing held on petition No.77 of 2022 on behalf of Electricity Department Govt of GOA. |
06/23/2023 |
|
14 |
Petition No.89/2022 |
DNHDDPDCL-396230 |
Dadra Nagar Haveli and Daman and Diu Power Distribution Corporation have in after refered to as the "petitoner" or "DNHDDPDCL",files the petion for Review of ARR of PY 2022-23 and Determination of ARR & Tariff of FY 2023-24 for its Distribution business of Dadra Nagar Haveli and Daman and Diu |
03/10/2023 |
|
15 |
Petition No. 99/2023: |
Electricity Wing of Engineering Department, Chandigarh, Sector -9D, Chandigarh, |
Tariff petition for True-up of FY 2020-21 and FY 2021-22 Annual performance Review of FY 2022-23 and Aggregate Revinue Requirement(ARR) Tarriff proposal for FY2023-24 Electricity wing of Engineering Department,Deluxe Building.UT,Chandigarh(EWEDC) |
02/06/2023 |
|
16 |
Petition No. 96/2022 |
ELCTRICITY DEPARTMENT PUDUCHERRY |
Electricity Department ,Puducherry- Tariff Petition Tue up for 2021-22 Annual performance Review(APR) for FY 2022-23 and Tariff Determination for FY 2023-24 Submitted regarding. |
12/26/2022 |
|
17 |
Petition No. 94/2022 |
Electricity Department of Daman & Diu |
petition for Approval of True up of FY 2021-22 Review of FY 2022-23 and ARR and Determination of Transmission Tariff for FY 2023-24 for Electricity Daman & Diu under section61,62,and 64 of the Electricity Act 2003 |
12/08/2022 |
|
18 |
Petition No. 95/2022 |
Electricity Department gov of Goa. |
Electricity Department, Government of Goa (hereinafter referred to as "EDG"), files petition for approval of APR for FY 2022-23, ARR for FY 2023-24 and Tariff Proposal for FY 2023-24 for the Electricity Department of Goa under section 45, 46, 61, 62, 64 and 86 of the Electricity Act, 2003 (EA 2003) |
12/08/2022 |
|
19 |
Petition No.93/2022 |
DNH and DD Power Corporation Limited |
Petition for Approval of ARR for the FY 2023-24 for DNH and DD Power Corporation Limited under section 61,62 and 64 of the EA, 2003 and Tariff Proposal for FY 2023-24 |
12/07/2022 |
|
20 |
Petition No. 92/2022 |
Electricity Department Transmission Devision Union Territory of Dadra Nagar Haveli and Daman and Diu |
Approval of Annual Revenue Requirement(ARR) petition and Tariff proposal of Electricity(Transmissin Devision) of Dadra Nagar haveli for FY 2023-24 under section 61,62 and 63 of th |
12/07/2022 |
|
21 |
Petition No. 91/2022 |
Lakshadweep Electricity Department Kavaratti-682555 |
Petition for APR for FY 2022-23 and ARR & Tariff Proposal for FY 2023-24 |
11/30/2022 |
|
22 |
Petition No. 85 of 2022 |
Electricity Department gov of Goa.,Vidyut Bhavan,Panaji Goa. |
petition for approval of True-up for FY 2017-18,FY 2018-19 and FY2019-20 by Electricity Department Govt of Goa. |
10/10/2022 |
|
23 |
Petition No. 78/2022 |
The Electricity Department Vidyut Bhawan,Port Blair 744101,U.T of Andaman& Nicobar |
Petition for approval Business Plan for 3-year MYT Control Period from FY 2022-23 to FY 2024-25 |
05/02/2022 |
|
24 |
Petition No. 81/2022 |
The Electricity Department Vidyut Bhawan,Port Blair 744101,U.T of Andaman& Nicobar |
Petition for Approval of APR for the FY 2021-22 & ARR & Tariff Proposal for the FY 2022-23, FY 2023-24 & FY 2024-25 |
05/02/2022 |
|
25 |
Petition No. 80/2022 |
Electricity Wing of Engineering Department Chandigarh.Delux Building Sector -9D Chandigarh UT |
Filing Petition for True-Up of FY 2020-21, Annual Performance Review of FY 2021-22 and Aggregate Revenue Requirement (ARR) for FY 2022-23 to FY 2024-25 and Tariff Proposal for FY 2022-23 of Electricity Wing of Engineering Department, Chandigarh. |
04/19/2022 |
|
26 |
Petition No. 79/2022 |
Electricity Wing of Engineering Department, Chandigarh, Delux Building Sector -9D, Chandigarh |
Filing Petition for the Business Plan for the control period of from FY 2022- 23 to FY 2024-25 for the Electricity Wing of Engineering Department, Chandigarh Administration as per Regulation 8 and 17 of JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2021 |
04/19/2022 |
|
27 |
Petition No. 74/2022 |
Lakshadweep Electricity Department Kavaratti-682555 |
Petition for approval of Business plan for 3 year MYT Control Period FY 2022-23 to FY 2024-25 |
01/12/2022 |
|
28 |
Petition No.75/2022 |
Lakshadweep Electricity Department Kavaratti-682555 |
Petition for true-up for FY 2017-18 and FY 2018-19, APR for FY 2021-22 and MYT Petition for thee control period FY 2022-23 to FY 2024-25 & Tariff Proposal for FY 2022-23 |
01/12/2022 |
|
29 |
Petition No. 60/2021:3 |
Puducherry Power Corporation Ltd.(PPCL), #10, Second Cross, fawahar Nagar, Boomiyanpet, PUDUCHERRY.6O5 OO5. |
FrcL - MYT Petition for PPCL C'as Power Silation FZs MW) for tre control perid N2-25 "l*g wi$ furnual Perforurance Review for the FY 2021-22, Revision of Tariff for &€ period 01.04.2019 to 31.00.2020 after the tnring up exerrise and Renrbion of Tariff for &e period 01.04.2020 to 31.08.mf after te Provisiomal truing op*ff* - Reg. |
01/05/2022 |
|
30 |
Petition No. 70/2021 |
ELCTRICITY DEPARTMENT GOVT OF PUDUCHERRY |
Electricity Department ,Puducherry- Tariff Petition Tue up for 2021-22 Annual performance Review(APR) for FY 2022-23 and Tariff Determination for FY 2023-24 Submitted regarding. |
01/05/2022 |
|
31 |
Petition no. 69/2021 |
ELCTRICITY DEPARTMENT PUDUCHERRY |
Petition for approval of the Business Plan for control period from FY 2022-23 to FY 2024-25 for the Electricity Department of Puducherry as per Regulation 8 and 17 of JERC (Generation, Transmission and Distribution Multi Year Tariff) |
01/05/2022 |
|
32 |
Petition No. 64/2021 |
The Electricity Department Vidyut Bhawan,Port Blair 744101,U.T of Andaman& Nicobar |
petition for approval of True-up for FY 2017-18,FY 2018-19 and FY2019-20 . |
12/30/2021 |
|
33 |
Petition No. 68/2021 |
DNH and DD Power Corporation Limited |
Filing of Aggregate Revenue Requirement(ARR) for Multi year tariff determination for the control period FY-2022-23 to 2024-25 under section 61-62 and 64 of the Electricity Act 2003 |
12/28/2021 |
|
34 |
Petition No. 67/2021 |
DNH Power Distribution Corporation Limited (DNHPDCL |
Petition for approval of Business Plan for the MYT Control Period FY 2022-2023 to FY 2024-25 for DNH Power Distribution Corporation Limited (DNHPDCL) under Section 61,62 and 64 of the Electricity Act, 2003 and Regulation 8 and 17 of JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2021. |
12/24/2021 |
|
35 |
Petition No. 66/2021 |
Electricity Department of Daman & Diu (hereinafter referred to as "EDDD" or "The Petitioner") Daman - Applicant |
Filing of Aggregate Revenue Requirement (ARR) for Multi Year Tariff Determination for the Control Period FY 2022-23 to FY 2024-25 under Section 62 and 86 of the Electricity Act, 2003 |
12/22/2021 |
|
36 |
Petition No. 65/2021 |
the Electricity Department of Daman & Diu, UT of Dadra and Nagar Haveli and Daman & Diu as per Regulation 8 and 17 of JERC |
Electricity Department of Daman & Diu- Business Plan for MYT Control Period: FY 2022-23 to FY 2024-25 |
12/22/2021 |
|
37 |
Petition No.63/2021 |
Electricity Department gov of Goa. |
Petition for Approval of APR for the FY 2021-22 & ARR & Tariff Proposal for the FY 2022-23, FY 2023-24 & FY 2024-25 |
12/14/2021 |
|
38 |
Petition No. 61/2021 |
Electricity Department of Daman & Diu (hereinafter referred to as "EDDD" or "The Petitioner") Daman - Applicant |
Aggregate Revenue Requirement(ARR) for Multi Year Tariff determinationfor the Control Period FY 2022-23 to FY 2024-25 for Electricity Department, Transmission Division, Dadra & Nagar Haveli, Union Territory of Dadra and Nagar Haveli and Daman & Diu under Section 61,62 and 64 of the Electricity Act, 2003 |
12/07/2021 |
|
39 |
Petition No. 71/2021 |
|
Petition for approval of Business plan for 3 year MYT Control Period FY 2022-23 to FY 2024-25 |
12/07/2021 |
|
40 |
Petition No. 62/2021 |
Electricity Department gov of Goa.,Vidyut Bhavan,Panaji Goa. |
Petition for approval Business Plan for Control Period Period from FY 2022-23 to FY 2024-25 for the Electricity Department of Goa as per Regulation 8 and 17 of JERC(Genaration,Transmission, and Distribution multi year Tariff) Regulation,2021. |
11/12/2021 |
|
41 |
Petition No. 45/2021 |
Ampluse Energy Solution Private Limeded VERSUS Electricity Department,Govement of Goa. |
Petition under Section 9, 42, 86 & other applicable provisions of the Electricity Act, 2003 read with the provisions of the JERC (Connectivity and Open Access in the Intra-State Transmission and Distribution) Regulations, 2017. |
04/27/2021 |
|
42 |
Petition No. 44/2021 |
The Electricity Department Vidyut Bhawan,Port Blair 744101,U.T of Andaman& Nicobar |
Petition for Approval of APR for the FY 2020-21 & ARR & Tariff Proposal for the FY 2021-22. |
04/23/2021 |
|
43 |
Petition No 41/2020 |
Lakshadweep Electricity Department Kavaratti-682555 |
Petition for Approval of APR for the FY 2020-21 & ARR & Tariff Proposal for the FY 2021-22. |
02/16/2021 |
|
44 |
Petition No. 40/2020 |
Electricity Wing of Engineering Department, Chandigarh Deluxe Building, Sector - 9D Chandigarh - U |
Petition for True-Up of FY 2019-20, Annual Performance Review of FY 2020-21 and Aggregate Revenue Requirement (ARR) & Tariff Proposal of FY 2021-22 of Electricity Wing of Engineering Department, Chandigarh |
01/20/2021 |
|
45 |
Petition No. 34/2020 |
Electricity Department, Puducherry |
PETITION FOR APPROVAL OF TRUE-UP OF FY 2019-20 AND REVISION OF AGGREGATE REVENUE REQUIREMENT (ARR) FY 2020-21 & FY 2021-22 AND DETERMINATION OF TARIFF FOR FY 2021-22 |
12/16/2020 |
|
46 |
Petition No.36/2020 |
Electricity Department of Daman & Diu (hereinafter referred to as "EDDD" or "The Petitioner") Daman - Applican |
Filing of Aggregate Revenue Requirement (ARR) for the FY 2021-22 under Section 62 and 86 of the Electricity Act, 2003 |
12/09/2020 |
|
47 |
Petition No. 38/2020 |
Electricity Department ,Transmission Division,UT of Dadra and Nagar Haveli |
Filling of Aggregate Revenue Requirement(ARR) for FY 2021-22 for Electricity Department transmission Devision Union Territory of Dadra and Nager Haveli under section 61,62 and 64 of the Electricity Act 2003 |
12/08/2020 |
|
48 |
Petition No. 39/2020 |
Electricity Department, Government of Goa, Vidyut Bhavan, Panaji, Goa |
Petition for approval of True-up of FY 2016-17 APR for FY 2020-21, Revision of ARR and Tariff Determination Proposal for FY 2021-22. |
12/01/2020 |
|
49 |
Petition No. 35/2020 |
The Managing Director Puducherry Power Corporation LId.(PPCL), #L0, Second Cross, fawahar Nagar, Boomianpet, Puducherry-6O5 005 |
Petition for determination and approval of tariff of ppcl Gas Power Station (32.5 MW) for the period ZOZI-ZZ along with Annual Performance Review for the Fy ZO2O-21, Reviiion of Tariff for the period 01.O4.ZO1B to 31.03.2019 after the provisional truing up exercise and Revision of Tariff for the period 01.O4.2O19 to 31 .O3.ZO2O after the provisional truing up exercise |
11/25/2020 |
|
50 |
Petition No. 23/2019 |
The Electricity Department Vidyut Bhawan,Port Blair 744101,U.T of Andaman& Nicobar |
Petition for Approval of Truing Up for FY 2016-17, Review of FY 2019-20, and Tariff proposal for the FY 2020-21 |
02/20/2020 |
|
51 |
Petition No. 24/2019 |
Petition for Approval of True up for FY 2015-16 and FY 2016-17, APR for FY 2019-20 and ARR & Tariff Proposal for FY 2020-21. |
Lakshadweep Electricity Department, Kavaratti – 682555 |
12/31/2019 |
|
52 |
Petition No. 21/2019 |
Electricity Department, Government of Goa, Vidyut Bhavan, Panaji, Goa |
Petition for approval of True-up of FY 2015-16 APR for FY 2019-20, Revision of ARR and Tariff Determination Proposal for FY 2020-21. |
12/11/2019 |
|
53 |
Petition No. 20/2019 |
ELCTRICITY DEPARTMENT PUDUCHERRY |
petition for filling of True-up FY.2017-18 and FY 2019-20 Aggregate Revenue Requirement(ARR) Determination of retail Teriff for FY 2020-21 |
12/09/2019 |
|
54 |
Petition No.17/2019 |
Electricity Wing of Engineering Department, Chandigarh Deluxe Building, Sector - 9D Chandigarh - U |
Petition for True-Up of FY 2018-19, Annual Performance Review of FY 2019-20 and Aggregate Revenue Requirement (ARR) & Tariff Proposal of FY 2020-21 of Electricity Wing of Engineering Department, Chandigarh |
12/04/2019 |
|
55 |
Petition No. 16/2019 |
Puducherry Power Corporation Ltd.(ppCL) |
The foint Electricity Regulatory Commission (Terms & Conditions for Determination of Tariff) Regulations, 2018 for approval of Tariff for I(araikal Gas Power StatiorL..{32.SMW) for the penod2020-2027. |
11/27/2019 |
|
56 |
Petition No.266/2018 |
Electricity Department, Government of Goa, Vidyut Bhavan, Panaji, |
Petition for approval of True-up of FY 2014-15, APR for FY 2018-19, Tariff Determination proposal for FY 2019-20 and Aggregate Revenue Requirement for MYT control period FY 2019-20 to FY 2021-22 for the Electricity Department of Goa under Section 45, 46, 61, 62, 64 and 86 of the Electricity Act, 2003 and Regulation 9 of JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2018. |
12/12/2018 |
|
57 |
Petition No. 268/2018 |
ELCTRICITY DEPARTMENT PUDUCHERRY |
Electricity Department - Government of Puducherry, Petition- Provisional True,up for FY 2017-18, Review for FY 2018-19 and ARR & MYT Petition for FY 2Ot9 20 to FY 2O2I-22 and Tariff determination for FY20 t9-20 - Submission - Reg. |
12/12/2018 |
|
58 |
Petition 267/2018 |
Electricity Wing of Engineering Department, Chandigarh Deluxe Building, Sector - 9D Chandigarh - UT |
Petition for True-Up of FY 2017-18, Annual Performance Review of FY 2018-19 and Aggregate Revenue Requirement (ARR) for the control period of FY 2019-20 to FY 2021-22 & Tariff Proposal of FY 2019-20 of Electricity Wing of Engineering Department, Chandigarh |
12/12/2018 |
|
59 |
Petition No.263/2018 |
Lakshadweep Electricity Department Kavaratti-682555 |
Lakshadeep Elec tricity Department-Submission of Bussuiness plan for 3 years Multi years Tariff Control period from FY2019-20 to FY 2021-22 reg |
11/29/2018 |
|
60 |
Petition No.264/2018 |
The Electricity Department Vidyut Bhawan,Port Blair 744101,U.T of Andaman& Nicobar |
Petition for approval of Business plan for 3 year MYT Control Period FY 2019-20 to FY 2021-22 |
11/19/2018 |
|
61 |
Petition No.265/2018 |
Electricity Department, Government of Goa Vidyut Bhavan, Panaji, Goa |
Petition for approval of the Business Plan for control period from FY 2019-20 to FY 2021-22 for the Electricity Department of Goa as per Regulation 8 and 16 of JERC (Generation, Transmission & Distribution Multi Year Tariff) Regulations, 2018. |
10/05/2018 |
|
62 |
Petition No. 260/2018 |
DNH Power Distribution Corporation Limited (DNHPDCL |
Filing of Aggregate Revenue Requirement(ARR) for Multi year tariff determination for the control period FY-2019-22 under section 61-62 and 64 of the Electricity Act 2003 |
09/10/2018 |
|
63 |
Petition no.259/2018 |
|
Electricity Department of Daman & Diu-Bussiness plan for MYT Control FY2019-20 to FY 2021-22 |
09/04/2018 |
|
64 |
Petition No. 258/2018 |
DNH Power Distribution Corporation Limited (DNHPDCL |
DNH power Disyribution Corporation Limited Business plan for MYT Control Period FY 2019-20 to FY 2021-22 |
09/04/2018 |
|
65 |
Petition No. 254/2018 |
ELECTRICITY WING OF ENGINEERING DEPARTMENT, CHANDIGARH Deluxe Building, Sector -9D Chandigarh- UT |
` PETITION FOR TRUE-UP OF FY 2016-17, ANNUAL PERFORMANCE REVIEW OF FY 2017-18 AND AGGREGATE REVENUE REQUIREMENT (ARR) & TARIFF PROPOSAL FOR FY 2018-19 of ELECTRICITY WING OF ENGINEERING DEPARTMENT, CHANDIGARH |
01/19/2018 |
|
66 |
Petition no. 249/2017 |
Electricity Department gov of Goa. |
Petition for Approval of the True up of FY 2013-14 APR for FY 2016-17 & FY 2017-18 and proposal for FY 2018-19 for the ElectriciDty Department of GOA .under section 45,46,61,62 and 86 of the Electricity act 2003.etermination |
01/03/2018 |
|
67 |
Petition No.248/2017 |
The Electricity Department, Vidyut Bhawan, Port Blair- 744101 |
Petition for Approval of True-up for FY 2014-15, Annual Performance Review of FY 2017-18 & Determination of Tariff for FY 2018-19. |
12/22/2017 |
|
68 |
Petition No. 251/2017 |
Electricity Department of Daman & Diu |
Filling of fpr Aggregate Requirement(ARR)for the FY-2018-19 uder section 62 and 86 of the Electricity Act 2003 |
12/22/2017 |
|
69 |
Petition No. 250/2017 |
For the Electricity Department (Transmission Division) Dadra & Nagar Haveli silvasa |
Approval of Annual Revenue Requirement(ARR) petition and Tariff proposal of Electricity(Transmissin Devision) of Dadra Nagar haveli for FY 2023-24 under section 61,62 and 64 of th |
12/22/2017 |
|
70 |
Petition No. 247/2017 |
for the DNH power Distribution Corporation Limited - Dadra & Nagar Haveli Silvasa |
Petition for Approval of Annual Revenue(ARR) and Tariff Proposal for FY 2018-19 for DNH Power Distribution Corporation Corporation Limeted under section 61,62 and 64 of Electricity Act 2003 |
12/21/2017 |
|
71 |
Petition No. 246/ 2017 |
Puducherry Power Corpn. Ltd.(PPCL), #10, Second Cross, Jawahar Nagar, Boomiyanpet, PUDUCHERRY-605 005. |
Petition under Section 62 and 83 (4) of the Electricity Act 2003 read with chapter-II of the Join Electricity Regulatory Commission (Terms & Conditions for Determination of Tariff) Regulations, 2009 for Revision of tariff for Karaikal Gas Power Station, (32.5 MW) for the period 2015-16 after the truing up exercise. |
12/07/2017 |
|
72 |
Petition No. 245/2017 |
ELCTRICITY DEPARTMENT PUDUCHERRY |
BEFORE THE HON'BLE JOINT ELECTRICITY REGULATORY COMMISSION FOR THE STATE OF PETITION FOR FILING OF TRUE-UP PETITION FOR FY 2OL6-L7, ANNUAL PERFORMANCE REVIEW OF FY 2OT7-IB AND ARR WITH TARIFF PROPOSAL FOR FY 2O1B-19 |
12/07/2017 |
|
73 |
Petition No. 240/2017 |
DNH Power Distribution Corporation Limited (DNHPDCL |
Petition for approval of True Up for FY 2016-17 for DNH Power Distribution Corporation Limited under section 61,62 and 64 of the Electricty Act 2003 |
09/20/2017 |
|
74 |
PETITION NO. 228/2017 |
Electricity Department, Government of Goa, VidyutBhavan, Panaji, |
Petition for approval of True-up of FY 2011-12 & FY 2012-13, APR for FY 2015-16 & FY 2016-17 and Tariff Determination proposal for FY 2017-18 for the Electricity Department of Goa under Section 45, 46, 61, 62, 64 and 86 of the Electricity Act, 2003 |
03/27/2017 |
|
75 |
Petition No. 229/2017 |
Chandigarh Electricity Department Deluxe Building, Sector -9D Chandigarh- UT |
Petition For True-Up Of FY 2015-16, Annual Performance Review Of FY 2016-17 And Aggregate Revenue Requirement (ARR) & Tariff Proposal For FY 2017-18 of Chandigarh Electricity Department |
01/19/2017 |
|
76 |
Petition No. 227/2017 |
Lakshadweep Electricity Department Kavaratti-682555 |
Approve the True up for FY 2012-13,provisional true up for FY 2013-14 & FY 2014-15 Annual Performance Review of FY 2016-17 & Determination of Teriff for 2017-18 for LED formulated in accordance with the guidelines outlined in the regulation of joint electricity Regulatory Commission regulatory to Distribution licences and the principle contained in tariff Regulation. |
01/02/2017 |
|
77 |
Petition No. 224/2014 |
ELECTRICITYDEPARTMENT,GOVERNMENTOF PUDUCHERRY |
Electricity Department - Government of Puducherry- True up petition for FY 2014-15,FY 2015-16 Review FY2016-17 and ARR for control period from FY 2017-18 -Reg |
01/02/2017 |
|
78 |
Petition No. 223/2017 |
the Electricity Department of Daman & Diu, UT of Dadra and Nagar Haveli and Daman & Diu as per Regulation 8 and 17 of JERC |
Approval of Annual Revenue Requirement(ARR) petition and Tariff proposal of Electricity(Transmissin Devision) of Dadra Nagar haveli for FY 2017-18 under section 61,62 and 64 of th |
01/02/2017 |
|
79 |
Petition No. 226/2017 |
DNH Power Distribution Corporation Limited (DNHPDCL |
Petition for Approval of Annual Revenue(ARR) and Tariff Proposal for FY 2017-18 for Distribution DNH power Distribution corporation Limeted under section 61,62, and 64 of the Electricity Act 2003 |
01/02/2017 |
|
80 |
Petition No. 222/2017 |
|
Petition for Approval of True up for FY 2015,16,Review of FY 2016-17 and Annual Revenue Requirement(ARR) and Teriff Revision proposal for FY 2017-18 for Union Territary of Daman & Diu under section 61,62 and 64 of Electricity Act 2003 |
01/02/2017 |
|
81 |
Petition No.221/2017 |
ELECTRICITY DEPARTMENT, LAKSHADWEEP |
True-up for FY 2012-13, Provisional True-up for FY 2013-14 & FY 2014-15 Annual Performance Review of FY 2016-17 Determination of Tariff for FY 2017-18. |
11/24/2016 |
|
82 |
Petition No. 216/2016 |
CHANDIGARH ELECTRICITY DEPARTMENT Load forecasting Study for long term power planning–Report |
This volume has been prepared by Feedback Infra Private Limited (hereinafter, “Feedback Infra”) based on the information shared by Chandigarh Electricity Department. (Hereinafter referred to as “CED” or “the Client”) for load forecasting activity of Chandigarh Electricity Department. |
08/01/2016 |
|
83 |
Petition No. 215/2016 |
Riflex Industries Private Limited Registered office at New #31, Old #14, Moore Street, Chennai 600001 And Branch office at Andaman Islands at 2nd Line, Opposite to Dr. Diwan Singh Gurudwara, Gurudwara Lane, Port Blair 744101. |
Determination of tariff for Procurement of Power by Distribution Company / Licensees from Biomass based Power Generating Company in in the Union Territory of Andaman and Nicobar Islands using the Gasification route (Otto Cycle) |
08/01/2016 |
|
84 |
Petition No. 214/2016 |
IN THE MATTER OF Riflex Industries Private Limited Registered office at New #31, Old #14, Moore Street, Chennai 600001 And Branch office at Andaman Islands at 2nd Line, Opposite to Dr. Diwan Singh Gurudwara, Gurudwara Lane, Port Blair 744101 |
Determination of tariff for Procurement of Power by Distribution Company / Licensees from Biomass based Power Generating Company in in the Union Territory of Andaman and Nicobar Islands using the Gasification route (Otto Cycle) |
08/01/2016 |
|
85 |
Petition No. 213/2016 |
Riflex Industries Private Limited Registered office at New #31, Old #14, Moore Street, Chennai 600001 And Branch office at Andaman Islands at 2nd Line, Opposite to Dr. Diwan Singh Gurudwara, Gurudwara Lane, Port Blair 744101. |
Determination of tariff for Procurement of Power by Distribution Company / Licensees from Biomass based Power Generating Company in in the Union Territory of Andaman and Nicobar Islands using the Gasification route (Otto Cycle) |
08/01/2016 |
|
86 |
Petition No. 209/2016 |
Chandigarh Electricity Department (hereinafter referred to as "CED" which shall mean for the purpose of this petition the Licensee), having its office at Chandigarh |
Review Petition in .respect of Tariff Order FY 2016-17 dated 28tn April 2016 issued by Hon'ble JERC for the UT Ghandigarh |
07/14/2016 |
|
87 |
Petition No. 212/2016 |
Andman and Nicobar Administration Vidut bhavan PortBlair -744101 |
Petition for determination of project specific Tariff for sale of power to Electricity Department of the Union Teritoryof A&N Island in respect of 1.25 MW renwable Wave Energy Project |
07/12/2016 |
|
88 |
Petition No. 212/2016 |
Andman and Nicobar Administration Vidut bhavan PortBlair -744101 |
Petition under section 61(h),62,64,84(i)(a),86(i)(a),86(i)b and 86(i)(e) of the Electricity Act,2003 for determination of tariff for sale of power to Electricity Department of Union Teritory of Andman and Nicobar Island in respect of Renewable Wave Energy Project of Hut Bay island at Andman and Nicobar Island |
07/12/2016 |
|
89 |
Petition No. 201/2016 |
Electricity Department, UT, Chandigarh. |
Chandigarh Renewal Energy Science & Technology Promotion Society (CREST), Ist Floor, Paryavaran Bhawan, Sector-19, Chandigarh |
04/01/2016 |
|
90 |
Petition No. 200/2016 |
handigarh Electricity Department (hereinafter referred to as "CED" which shall mean for the purpose of this petition the Licensee), having its office at Chandigar |
Petition for approval of Draft Solar Net/Gross Metering Power Purchase Agreement (PPA). |
03/22/2016 |
|
91 |
Petition No. 198/2016 |
CHANDIGARH ELECTRICITY DEPARTMENT |
PETITION FOR TRUE-UP OF FY 2013-14 & FY 2014-15, ANNUAL PERFORMANCE REVIEW OF FY 2015-16 AND AGGREGATE REVENUE REQUIREMENT (ARR) FOR MYT CONTROL PERIOD FROM FY 2016-17 TO FY 2018-19 & TARIFF PROPOSAL FOR FY 2016-17 of CHANDIGARH ELECTRICITY DEPARTMENT |
02/29/2016 |
|
92 |
Petition No. 197/2016 |
: Electricity Department, Government of Goa Vidyut Bhavan, Panaji |
Petition for approval of Annual Performance Review of FY 2015-16, Multi Year Tariff for the First Control Period of FY 2016-17 to FY 2018-19 and Tariff Proposal for FY 2016-17 for the Electricity Department of Goa under Section 45, 46, 61, 62, 64 and 86 of the Electricity Act, 2003 |
02/18/2016 |
|
93 |
Petition No. 196/2016 |
The Electricity Department, Vidyut Bhawan, Port Blair- 744101, U.T. of Andaman & Nicobar |
Petition for Approval of M ulti Year Tariff (MYT) and Revenue Requirement for the control period FY 2016-17 to FY 2018-19 for Union Territory of Andaman & Nicobar Islands under Sections 61, 62 and 64 of The Electricity Act 2003 |
02/09/2016 |
|
94 |
Petition No. 195/2016 |
Electricity Department, Transmission Division, UT of Dadra and Nagar Haveli |
Filing of Aggregate Revenue Requirement (ARR) for the FY 16-17 for Electricity Department, Transmission Division, Union Territory of Dadra and Nagar Haveli under Section 61, 62 and 64 of the Electricity Act, 2003 |
01/25/2016 |
|
95 |
Petition No. 192/2016 |
Electricity Department of Daman & Diu |
Filing of Aggregate Revenue Requirement (ARR) for Multi Year Tariff Determination for the Control Period FY 2016-17 to FY 2018-19 under Section 62 and 86 of the Electricity Act, 2003 |
01/19/2016 |
|
96 |
Petition No. 194/2016 |
Lakshadweep Electricity Department, Kavaratti – 682555 |
Petition for Approval of ARR & Tariff Proposal for MYT Control Period From FY 2016-17 to 2018-19. |
01/19/2016 |
|
97 |
Petition No. 190 /2016 |
ELECTRICITY DEPARTMENT, GOVERNMENT OF PUDUCHERRY |
True-up for FY 2013-14, Provisional True-up for FY 2014-15, Review for FY 2015-16 and ARR & MYT Petition for FY 2016-17 to FY 2018-19 |
01/07/2016 |
|
98 |
Petition No. 191/2016 |
Puducherry Power Corporation Ltd.(PPCL), |
Regulatory Commission (Term s & Conditions for Determination o f Tariff) Regulations, 2009 for approval o f Tariff for Karaikal Gas Power Station, (32.5M W ) for the period 2016-17. |
01/07/2016 |
|
99 |
Petition No. 148/2014 |
Electricity Department of Daman & Diu |
Filing of Aggregate Revenue Requirement (ARR) for Multi Year Tariff Determination for the Control Period FY 2015-16 to FY 2017-18 under Section 62 and 86 of the Electricity Act, 2003 |
12/02/2015 |
|
100 |
Petition No. 186 /2015 |
: Electricity Department, Government of Goa, Vidyut Bhavan, Panaji, Goa |
Petition for approval of the Business Plan for control period from FY 2016-17 to FY 2018-19 for the Electricity Department, Government of Goa as per Regulation 4.2 & 5.1 of JERC (M ulti Year Distribution) Tariff Regulations, 2014 |
09/06/2015 |
|
101 |
Petition No. 186 /2015 |
Electricity Department, Government of Goa, Vidyut Bhavan, Panaji, Goa |
Petition for approval of the Business Plan for control period from FY 2016-17 to FY 2018-19 for the Electricity Department, Government of Goa as per Regulation 4.2 & 5.1 of JERC (M ulti Year Distribution) Tariff Regulations, 2014. |
09/06/2015 |
|
102 |
Petition No. 183/2015 |
CHANDIGARH ELECTRICITY DEPARTMENT |
CED- Business Plan for MYT Control Period: FY17 to FY19 0 | P a g e Business Plan for MYT Control Period FY 2016- 17 to FY 2018-19 |
08/18/2015 |
|
103 |
Petition No. 185 /2015 |
The Electricity Department, Vidyut Bhawan, Port Blair-744101 |
Petition for Approval of Business Plan for 3 year MYT Control Period From FY 2016-17 to 2018-19. |
08/14/2015 |
|
104 |
Petition No. 182/2015 |
Business Plan for MYT Control Period FY 2016-17 to FY 2018-19 Submitted to: Joint Electricity Regulatory Commission for the State of Goa & Union Territories Submitted By: DNH Power Distribution Corporation LTD |
DNH Power Distribution Corporation Limited - Business Plan for MYT Control Period: FY 2016-17 to FY 2018-19 |
08/08/2015 |
|
105 |
Petition No. 179/2015 |
ELECTRICITY DEPARTMENT, GOVERNMENT OF GOA VIDYUT BHAWAN,3RDFLOOR, PANAJI, GOA... |
Petition for approval of Tariff and Agreement for supply of surplus power from biomass based captive power plant of Merck Limited to Electricity Department, Government of Goa, under Section 62 (1) (a) and 86 (1) (a), (b) & (e) of the Electricity Act, 2003 |
07/28/2015 |
|
106 |
Petition No. 180/2015 |
Electricity Department of Daman & Diu |
Electricity Department of Daman & Diu- Business Plan for MYT Control Period: FY 2016-17 to FY 2018-19 |
07/28/2015 |
|
107 |
Petition No. 181/2015 |
ELCTRICITY DEPARTMENT PUDUCHERRY |
Electricity Department puducherry multi-year tariff Bussiness plan petition for the period from 2016-17 to 2018-19. Regarding. |
07/05/2015 |
|
108 |
Petition No. 161/ 2015 |
: Electricity Department, Government of Goa Vidyut Bhavan, Panaji, Goa |
Petition for approval of Annual Performance Review of FY 2014-15, Multi Year Tariff for the First Control Period of FY 2015-16 to FY 2017-18 and Tariff Proposal for FY 2015-16 for the Electricity Department of Goa under Section 45, 46, 61, 62, 64 and 86 of the Electricity Act, 2003 |
01/20/2015 |
|
109 |
Petition No. 157/ 2014 |
True-up for FY 2011-12 & FY 2012-13, Provisional True-up for FY 2013-14, Review for FY 2014-15 and ARR & MYT Petition for FY 2015-18 Electricity Department, Puducherry |
True-up for FY 2011-12 & FY 2012-13, Provisional True-up for FY 2013-14, Review for FY 2014-15 and ARR & MYT Petition for FY 2015-18 |
01/02/2015 |
|
110 |
Petition No. 155/ 2014 |
Electricity Department, Union Territory of Andaman & Nicobar Islands |
approval of Multi Year Tariff and Revenue Requirement for the control period FY 2015-16 to 2017-18 under Section 61, 62 and 64 of the Electricity Act, 2003. |
12/15/2014 |
|
111 |
Petition No. 150/2014 |
Electricity Department ,Transmission Division,UT of Dadra and Nagar Haveli |
Filing of Aggregate Revenue Requirement(ARR) for the FY 2015-16 for Electricity Department,Transmission Devision Union Teritory of dadra and Nagar Haveli under section 61,62,and 64 of the electricity Act 2003 |
12/02/2014 |
|
112 |
Petition No. 151/2014 |
DNH Power Distribution Corporation Limited |
Filing of Aggregate Revenue Requirement (ARR) for Multi Year Tariff Determination for the Control Period FY 2015-16 to FY 2017-18under Section 61, 62 and 64 of the Electricity Act, 2003 |
12/02/2014 |
|
113 |
Petition No. 153/ 2014 |
Electricity Department of Daman & Diu. Plot No 35, OIDC Complex, Near Fire Station, Somnath, Daman - 396210 |
Filing of Business plan for the MYT Control Period FY 2015-18 for Union Teritorities,' of Daman and Diu under Section 61,62 and 64 of the Electricity Act, 2003 |
12/02/2014 |
|
114 |
Petition No. 152/ 2014 |
The Electricity Department, Vidyut Bhawan, Port Blair-744101 |
Petition for Approval of Business Plan for 3 year MYT Control Period From FY 2015-16 to 2017-18 |
11/17/2014 |
|
115 |
Petition No. /2014 |
Electricity Department – Chandigarh |
Petition No. 129/2014 – Orders for implementation of detailed study on Manpower Requirement of Chandigarh Electricity Department conducted by M/S Deloitte Touche Tohmatsu India Pvt. Ltd. |
07/19/2014 |
|
116 |
Petition No. 133/2014 |
IN THE MATTER OF: Electricity Department, UT, Chandigarh |
Chandigarh Renewal Energy Science & Technology Promotion Society, Ist Floor, Paryavaran Bhawan, Sector 19, Chandigarh ( Referred herein after as CREST in the petition) Through its Chief Executive Officer Sh. Santosh Kumar |
05/22/2014 |
|
117 |
Petition No. 129/2014 |
CHANDIGARH ELECTRICITY DEPARTMENT |
petion in respect to details study on manpower requirement at chandigrah Electricity department |
02/17/2014 |
|
118 |
Petition No. 128/2014 |
ELCTRICITY DEPARTMENT PUDUCHERRY |
Electricity Department puducherry,approval for implementation of DSM based Efficient Lighting Program (DELP) in UT of Puducherry under Demand Side Management Programed. |
02/14/2014 |
|
119 |
Petition No. 126/2014 |
Chandigarh Electricity Department Deluxe Building, Sector – 9D Chandigarh, UT |
Filing of Petition for Approval of the Aggregate Revenue Requirement (ARR) and Tariff Proposal for FY 2014-15 for the Chandigarh Electricity Department under Section 45, 46, 61, 62, 64 and 86 of the Electricity Act, 2003 |
01/21/2014 |
|
120 |
Petition No. 130/2014 |
Petition before the Joint Electricity Regulatory Commission for the state of Goa and Union Territories |
Petition for determination of tariff for supply of surplus power from co- generation power plant of Goa Sponge and Power Limited to Goa Electricity Department under Section 62 (1) (a) and 86 (1) (a) to (e) of The Electricity Act, 2003 |
01/21/2014 |
|
121 |
Petition No. 125/2014 |
Electricity Department Govt.Puducherry |
Petition for Approval of ARR requirment Exprected Revenue From ChargesTariff Proposal For FY 2014--15 |
01/20/2014 |
|
122 |
Petition No. 124/2014 |
The Electricity Department, Vidyut Bhawan, Port Blair-744101 |
Petition for Approval of Annual Revenue Requirement (ARR) and Tariff Proposal for FY 2014-15 for Union Territory of Andaman & Nicobar under Sections 61, 62 and 64 of The Electricity Act 2003 |
01/16/2014 |
|
123 |
Petition No. 123/2014 |
Department of Electricity Lakshadweep |
Filing of Aggregate Revenue Requirement (ARR) for the FY 2014-15 for Union Territory of Lakshadweep under Section 61, 62 and 64 of the Electricity Act, 200 |
01/15/2014 |
|
124 |
Petition No. 122/2014 |
Electricity Department gov of Goa. |
Petition for approval of Review for FY 2013-14 and Aggregate Revenue Requirement (ARR) for FY 2014-15 for the Electricity Department of Goa under Section 45, 46, 61 62, 64 and 86 of the Electricity Act, 2003 |
01/13/2014 |
|
125 |
Petition No. 121/2014 |
Puducherry Power Corporation Ltd.(PPCL) |
Petition under Section 62 and 83 (4) of the Electricity Act 2003 read with chapter-II of the Joint Electricity Regulatory Commission (Terms & Conditions for Determination of Tariff) Regulations, 2009 for approval of Tariff for Karaikal Gas Power Station, (32.5MW) for the period 2014-15 |
01/09/2014 |
|
126 |
Petition No. 158/ 2014 |
ELCTRICITY DEPARTMENT PUDUCHERRY |
BUUSSIINNEESSSS PPLLAANN FFOORR TTHHEE CCOONNTTRROOLL PPEERRIIOODD FFYY 22001155--1166 TTOO FFYY 22001177--1188 OOFF EELLEECCTTRRIICCIITTYY DDEEPPAARRTTMMEENNTT,, GGOOVVEERRNNMMEENNTT OOFF PPUUDDUUCCHHEERRRRYY |
01/01/2014 |
|
127 |
Petition No. 120/2013 |
DNH Power Distribution Corporation Limited |
Filing of Revised Aggregate Revenue Requirement (ARR) for the FY 14-15 for Union Territory of Dadra and Nagar Haveli under Section 61, 62 and 64 of the Electricity Act, 2003 |
11/26/2013 |
|
128 |
Petition No. 120/2013 |
DNH Power Distribution Corporation Limited |
Filing of Aggregate Revenue Requirement (ARR) for the FY 14-15 for Union Territory of Dadra and Nagar Haveli under Section 61, 62 and 64 of the Electricity Act, 2003 |
11/26/2013 |
|
129 |
Petition No. 119/2013 |
Perfect Filaments Ltd. ………..Petitioner Survey No.285, Bhimpore, Daman |
Petition filed under Section 86(1)(c) and Section 142 of the Electricity Act, 2003 read with JERC (Open Access in Transmission and Distribution) Regulations, 2009 |
11/11/2013 |
|
130 |
Petition No. 114/2013 |
Electricity Department of Daman & Diu |
Filing of Aggregate Revenue Requirement (ARR) for the FY 14-15 under Section 62 and 86 of the Electricity Act, 2003 |
11/01/2013 |
|
131 |
Petition No. 110/2013 |
Annexure A-3 Rooftop SPV Projects with Evacuation on HT Side |
Annexure A-3 Rooftop SPV Projects with Evacuation on HT Side |
08/29/2013 |
|
132 |
Petition No. 110/2013 |
Electricity Department of UT Chandigarh under section 61, 62, 86 and 181 of the Electricity Act, 2003 |
he O & M cost has been estimated as follows: Cost of O & M from 11th to 15th year @ 2% of project cost per annum, Cost of O & M from 16th to 20th yea |
08/29/2013 |
|
133 |
Petition No. 110/2013 |
Power Projects of CREST and for sale of such power to the Electricity Department of UT Chandigarh |
Ministry of New and Renewable Energy has declared Chandigarh as a Model solar City vide letter No. 3/1/2008-UICA(SE) dated 18th.Feb.2008 for which a master plan was prepared and submitted to the Ministry for approval. The designated committee of the Ministry approved the master plan on 4th of January, 2012. |
08/29/2013 |
|
134 |
Petition No. 110/2013 |
Electricity Department of UT Chandigarh |
Chandigarh Renewal Energy and Science & Technology (CREST) Promotional Society Sector 19B, Chandigarh. Contact No. 0172-2703982 |
08/29/2013 |
|
135 |
Petition No. 110/2013 |
Chandigarh Renewal Energy Science & Technology Promotion Society (CREST) Ist Floor, Paryavaran Bhawan, Sector- 19, Chandigarh |
Petition for seeking determination of Preferential Tariff under Net Metering for Rooftop Solar Photovoltaic Power Projects of CREST and for sale of such power to the Electricity Department of UT Chandigarh under section 61, 62, 86 and 181 of the Electricity Act, 2003 and as per Joint Electricity Regulatory Commission for State of Goa & Union Territories (Procurement of Renewable Energy) Regulations 2010 |
08/29/2013 |
|
136 |
Petition No. 110/2013 |
Electricity Department of UT Chandigarh |
Global Energy private Limited-Application for grnt of an Intra-State Trading Licence |
08/29/2013 |
|
137 |
Petition No. 103/2013 |
Petition for grant of Intra-State Trading Licence –Goa |
Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 |
05/06/2013 |
|
138 |
Petition No. 103/2013 |
Petition for grant of Intra-State Trading Licence –Goa |
Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 |
05/06/2013 |
|
139 |
Petition No. 103/2013 |
Petition for grant of Intra-State Trading Licence –Goa |
Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 |
05/06/2013 |
|
140 |
Petition No. 103/2013 |
Petition for grant of Intra-State Trading Licence –Goa |
Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 |
05/06/2013 |
|
141 |
Petition No. 103/2013 |
Petition for grant of Intra-State Trading Licence –Goa |
Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 |
05/06/2013 |
|
142 |
Petition No. 103/2013 |
Petition for grant of Intra-State Trading Licence –Goa |
Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 |
05/06/2013 |
|
143 |
Petition No. 103/2013 |
Petition for grant of Intra-State Trading Licence –Goa |
Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 |
05/06/2013 |
|
144 |
Petition No. 103/2013 |
Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 |
Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 |
05/06/2013 |
|
145 |
Petition No. 103/2013 |
Petition for grant of Intra-State Trading Licence –Goa |
Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 |
05/06/2013 |
|
146 |
Petition No. 103/2013 |
Petition for grant of Intra-State Trading Licence –Goa under Section 14 |
Govement of india- Ministry of Corporate Affairs.Registerof compalence,Goa,Daman and diu |
05/06/2013 |
|
147 |
Petition No. 103/2013 |
Gloabal Energy Private Limited - Application for Grant of Intra-State trading Licence |
Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 |
05/06/2013 |
|
148 |
Petition No. 101/2013 |
Annual Revenue Requirement (ARR) for FY 12-13 |
Department of Electricity Lakshadweep ANNUAL REVENUE REQUIREMENT FOR THE YEAR FY 13-14 ENERGY DEMAND |
04/09/2013 |
|
149 |
Petition No. 101/2013 |
|
Annexure I |
04/09/2013 |
|
150 |
Petition No. 101/2013 |
Department of Electricity Lakshadweep |
Filing of Aggregate Revenue Requirement (ARR) for the FY 2012-13 for Union Territory of Lakshadweep under Section 61, 62 and 64 of the Electricity Act, 2003 |
04/09/2013 |
|
151 |
Petition No. 102/2013 |
Review petition under section 94 of the Electricity Act, 2003 |
M/S Saheli Exports private Limited |
04/08/2013 |
|
152 |
Petition No. 100/2013 |
Aggregate Revenue Requirement and Tariff petition for FY 2013-14 |
Provisional True-Up Petition for FY 2011-12, Review Petition for FY 2012-13 and ARR & Tariff Petition for FY 2013-14 |
02/15/2013 |
|
153 |
Petition No. 98/2013 |
Puducherry Power Corporation Ltd.(PPCL), #10, Second Cross, Jawahar Nagar, Boomianpet, Puducherry-605 005 |
Petition under Section 62 and 83 (4) of the Electricity Act 2003 read with chapter-II of the Joint Electricity Regulatory Commission (Terms & Conditions for Determination of Tariff) Regulations, 2009 for approval of Tariff for Karaikal Gas Power Station, (32.5MW) for the period 2013-14. |
02/05/2013 |
|
154 |
Petition No. 99/2013 |
Electricity Department, Government of Goa Vidyut Bhavan, Panaji, Goa |
Petition for Approval of the Aggregate Revenue Requirement (ARR) for FY 2013-14 for the Electricity Department of Goa under Section 45, 46, 61, 62, 64 and 86 of the Electricity Act, 2003 |
02/05/2013 |
|
155 |
Petition No. 96/2013 |
Aggregate Revenue Requirement and Tariff petition for FY 2013-14 |
Petition for approval of Aggregate Revenue Requirement (ARR), Expected Revenue from Charges (ERC), Tariff Revision for FY2013-14 Of Electricity Department, Government of Puducherry |
02/05/2013 |
|
156 |
Petition No. 93/2013 |
Electricity Deparment Andman Nicobar Administration |
Petition for Approval of Power Purchase agreement between Electricity Department A & N Adminnistraton,Vidyut Bhawan Port Blair-744101 and NTPC Limited NTPC Bhawan,Core 7,Scope Complex Institunal Area Lodhi Road ND-110003 |
01/14/2013 |
|
157 |
Petition No. 94/2013 |
Petition for approval of Power Purchase Agreement between Electricity Department, Andaman & Nicobar Administration and M/s Surya Chak |
DETAILED PROJECT REPORT FOR 2.28 MW BIOMASS BASED POWER PROJECT AT ANDAMAN & NICOBAR ISLANDS |
01/10/2013 |
|
158 |
Petition No. 94/2013 |
The Electricity Department Vidyut Bhawan,Port Blair 744101,U.T of Andaman& Nicobar |
Petion for Approval of power purchase Agreement between Electricity Department "A & N" Adminstration,Vidyut Bhawan Port Blair And M/S Suryachakra Green Fuels Pvt.Ltd.Surachakra House,Plot No.34-L-III, Road No.78,Jublee Hills,Hydrebad |
01/10/2013 |
|
159 |
Petition No. 90/2012 |
Electricity Department of Daman & Diu |
Filing of Aggregate Revenue Requirement (ARR) for the FY 13-14 under Section 62 and 86 of the Electricity Act, 2003 |
11/30/2012 |
|
160 |
Petition No. 92/2012 |
Aggregate Revenue Requirement and Tariff petition for FY 2013-14 |
Filing of Aggregate Revenue Requirement (ARR) for the FY 13-14 for Union Territory of Dadra and Nagar Haveli under Section 61, 62 and 64 of the Electricity Act, 2003 |
11/30/2012 |
|
161 |
Petition No. 89/2012 |
Electricity Department Rep. by its Superintending Engineer Port Blair, Andaman & Nicobar Islands1,2,The Chief Secretary Andaman & Nicobar Administration Secretariat, Port Blair Port Blair, Andaman & Nicobar Islands. |
PETITION FOR APPROVAL OF COMPLETED/ACTUAL CAPITAL COST OF THE PROJECT AND TARIFF OF THE PETITIONER – A POWER GENERATING COMPANY - UNDER REGULATIONS 3(2)(a), 3(4), 12, AND 36 OF THE JOINT ELECTRICITY REGULATORY COMMISSION FOR THE STATE OF GOA AND UNION TERRITORIES (TERMS AND CONDITIONS FOR DETERMINATION OF TARIFF) REGULATIONS, 2009 READ WITH SECTIONS 62 (1) (a) AND 63 OF THE ELECTRICITY ACT, 2003 |
11/29/2012 |
|
162 |
Petition No. 91/2012 |
TheElectricityDepartment, VidyutBhawan,Port Blair-744101 |
Petition for Approval of Annual Revenue Requirement (ARR) and Tariff Proposal for FY 2013-14 for Union Territory of Andaman & Nicobar under Sections 61, 62 and 64 of The Electricity Act 2003 |
11/29/2012 |
|
163 |
Petition No. 85/2012 : |
Department of Electricity Lakshadweep |
Filing of Aggregate Revenue Requirement (ARR) for the FY 2012-13 for Union Territory of Lakshadweep under Section 61, 62 and 64 of the Electricity Act, 2003 |
08/01/2012 |
|
164 |
Petition No.63/2012 |
Electricity Department of Daman & Diu (Hereinafter referred to as “EDDD” or “The Petitioner”) Daman |
Aggregate Revenue Requirement (ARR) Order for the FY 2010-11 & Determination of Tariff for FY11 Dated 01.11.2010 |
02/14/2012 |
|
165 |
Petition No. 70/2012 |
Electricity Department, Goa Vidyut Bhavan, Panaji, Goa |
Petition for Approval of the Aggregate Revenue Requirement (ARR) for FY 2012-13 for the Electricity Department of Goa under Section 45, 46, 61, 62, 64 and 86 of the Electricity Act, 2003 |
01/25/2012 |
|
166 |
Petition No. 66/2012 |
MP Powers Limited Silvassa, Survey No. 263/3/2/2, Village Sayli, Umerkuin Road, Dadra and Nagar Have |
Petition for seeking determination of Project Specific Preferential Tariff for Rooftop Solar Photo Voltaic Project of M/s IMP Powers Limited and for sale of such power to the Electricity Department of Union Territories of Dadra and Nagar Haveli under Section 61, 62, 86 and 181 of the Electricity Act, 2003 and as per the Joint Electricity Regulatory Commission for State of Goa & Union Territories (Procurement of Renewable Energy) Regulations, 2010. |
01/09/2012 |
|
167 |
Petition No.64/2012 |
Chandigarh Electricity Department Deluxe Building Sector – 9D Chandigarh, UT |
Petition for Approval of the Aggregate Revenue Requirement (ARR) and Tariff Proposal for FY 2012-13 for the Chandigarh Electricity Department under Section 45, 46, 61, 62, 64 and 86 of the Electricity Act, 2003 |
12/30/2011 |
|
168 |
Petition No. 62/2012 |
Electricity Department of Dadra & Nagar Haveli |
Filing of Aggregate Revenue Requirement (ARR) for the FY 12-13 for Union Territory of Dadra and Nagar Haveli under Section 61, 62 and 64 of the Electricity Act, 2003 |
11/30/2011 |
|
169 |
Petition No. 63/2012: |
Electricity Department of Daman & Diu |
Filing of Aggregate Revenue Requirement (ARR) for the FY 12-13 under Section 62 and 86 of the Electricity Act, 2003 |
11/30/2011 |
|
170 |
Petition No. 65/2012 |
The Electricity Department, Vidyut Bhawan, Port Blair -744101 |
Petition for Approval of Annual Revenue Requirement (ARR) and Tariff Proposal for FY 2012-13 for Union Territory of Andaman & Nicobar under Sections 61, 62 and 64 of The Electricity Act 2003 |
11/25/2011 |
|
171 |
Petition No. 60/2011 |
Electricity Department, Government of Puducherry |
Aggregate Revenue Requirement (ARR), Expected Revenue fromCharges (ERC) And Tariff Revision for FY2012-13 |
11/23/2011 |
|
172 |
Petition No. 40/2011 |
Electricity Department, Goa Vidyut Bhavan, Panaji, Goa |
Petition for Approval of the Aggregate Revenue Requirement (ARR) and Tariff Proposal for FY 2011-12 for the Electricity Department of Goa under Section 45, 46, 61, 62, 64 and 86 of the Electricity Act, 2003 |
09/24/2011 |
|
173 |
Petition No. 39 /2011 |
Electricity Department Represented by its Secretary Government of puducherry chief Secreteriat,Goubert Salai Puducherry -605001 |
Saheli Export private Limited New No.25,old No.10,Madhavan Nair Road Mahalingapuram,Nungambakkam,Chenni-600034 |
06/28/2011 |
|
174 |
Petition No. 72/2012 |
ELECTRICITY DEPARTMENT, U.T ADMINISTRATION OF DAMAN AND DIU, POWER HOUSE BUILDING NANI DAMAN |
POWER PURCHASE AGREEMENT FOR PROCUREMENT OF 5 MW SOLAR POWER FROM NEW GRID CONNECTED SOLAR PROJECT ON LONG TERM BASIS (UNDER NEW PROJECTS SCHEME) |
03/14/2011 |
|
175 |
Petition No. 208/2016 |
Electricity Deparment Andman Nicobar Administration |
Petition for Approval of tariff of 1MW Grid Connected Roof-Top solar PV Project in Andman and Nicobar Island under section 62 and 83(4) of electricity of Act 2003 and under regulation 21,57,58,59 &60 of the JERC (Soloar Power -Grid Connected Ground Mounted and Solar rooftop and Merring Regulation,2015 |
|
|
176 |
Petition No. 37/2020 |
DNH Power Distribution Corporation Limited (hereinafter referer to as "DNHPDCL" or "the petition" or the Department"). |
Filling of Aggregate Revenue Requirement(ARR) for FY 2021-22 under section 61,62 and 64 of the Electricity Act,2003 |
|
|
177 |
Petition No. 108/2023 |
DNHDDPDCL-396230 |
Filing the petition under section 94 of the Electricity Actct,2003 read with regulation 74(B) of the JERC (Conduct of bussiness) Regulation,2009. Order dated 01.08.2003 passed by the Honable Commissin in petition N0.89 of 2022 and DNHDDPDCL-396230 |
|
|